X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0596022502000

Well Details

Well ID: 0596022502000
Loading map...
Location: 00/02-25-059-02W6/0
Location Alias: 00/02-25-59-02 W6M
Location Alias 2: 00/02-25-059-02 W6/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 6
Range: 02
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER HZ RESTHA 2-25-59-2
Operator Name: Jupiter Resources Inc.
License Number: 0413566
License Date: 2009-10-30
License Status: Issued
Spud Date: 2009-12-03
Final Drill Date: 2010-01-07
Well Total Depth: 4536.00 m
Surface Hole Latitude: 54.132441
Surface Hole Longitude: -118.180508

For data sources see[1][2]

Well History

Date Event
2009-10-30 Obtained License
2009-12-08 Surface Casing Operation Performed
2009-12-15 Intermediate Casing Operation Performed
2009-12-18 Direction Drilling Operation Performed - Horizontal
2009-12-25 Well Log Performed
2010-01-05 Well Log Performed
2010-01-07 Finished Drilling
2010-01-07 Well Mode changed to Drilled and Cased
2010-01-08 Production Casing Operation Performed
2010-01-11 Rig Released
2010-02-24 Well Log Performed
2010-02-25 Well Log Performed
2010-03-04 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-03-04 Perforation Treatment Performed - Fractured
2010-03-04 Well Log Performed
2010-03-05 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-03-05 Perforation Treatment Performed - Fractured
2010-03-06 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-03-06 Perforation Treatment Performed - Fractured
2010-03-11 Well Fluid changed to Gas
2010-03-11 Well Mode changed to Testing
2010-03-19 Well Began Production
2010-03-19 Well Fluid changed to Gas
2010-03-19 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-12-18 2968.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-04 Hydra Jet Perforation 4508.00 4508.10 0
2010-03-05 Fracture 4045.00 4045.10 0
2010-03-06 Hydra Jet Perforation 3920.00 3920.10 0
2010-03-06 Fracture 3920.00 3920.10 0
2010-03-06 Hydra Jet Perforation 3820.00 3820.10 0
2010-03-06 Fracture 3820.00 3820.10 0
2010-03-06 Hydra Jet Perforation 3720.00 3720.10 0
2010-03-06 Fracture 3720.00 3720.10 0
2010-03-06 Hydra Jet Perforation 3620.00 3620.10 0
2010-03-06 Fracture 3620.00 3620.10 0
2010-03-06 Hydra Jet Perforation 3505.00 3505.10 0
2010-03-04 Fracture 4508.00 4508.10 0
2010-03-06 Fracture 3505.00 3505.10 0
2010-03-06 Hydra Jet Perforation 3339.00 3339.10 0
2010-03-06 Fracture 3339.00 3339.10 0
2010-03-04 Hydra Jet Perforation 4392.00 4392.10 0
2010-03-04 Fracture 4392.00 4392.10 0
2010-03-05 Hydra Jet Perforation 4292.00 4292.10 0
2010-03-05 Fracture 4292.00 4292.10 0
2010-03-05 Hydra Jet Perforation 4154.20 4154.30 0
2010-03-05 Fracture 4154.20 4154.30 0
2010-03-05 Hydra Jet Perforation 4045.00 4045.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 3464 0.0 0.0 0.0
2011 8329 0.0 0.0 0.0
2012 8040 0.0 0.0 0.0
2013 8291 0.0 0.0 0.0
2014 7384 0.0 0.0 0.0
2015 6396 0.0 0.0 0.0
2016 3873 0.0 0.0 0.0
2017 6360 0.0 0.0 0.0
2018 6826 0.0 0.0 0.0
2019 7438 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[6]

References