X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0596081706003

Well Details

Well ID: 0596081706003
Loading map...
Location: 00/06-17-059-08W6/3
Location Alias: 00/06-17-59-08 W6M
Location Alias 2: 00/06-17-059-08 W6/03
Country: Canada
Province: Alberta
Township: 059
Meridian: 6
Range: 08
Section: 17
County/Municipality: Municipal District of Greenview No. 16
Well Name: KELT EXP GRDCACH 6-17-59-8
Operator Name: Kelt Exploration Ltd.
License Number: 0298278
License Date: 2003-12-09
License Status: Abandoned
Spud Date: 2003-12-31
Final Drill Date: 2004-08-07
Well Total Depth: 4332.00 m
Surface Hole Latitude: 54.095088
Surface Hole Longitude: -119.171322

For data sources see[1][2]

Well History

Date Event
2003-12-09 Obtained License
2004-02-21 Direction Drilling Operation Performed - Sidetrack Fish
2004-03-06 Surface Casing Operation Performed
2004-05-28 Intermediate Casing Operation Performed
2004-07-02 Direction Drilling Operation Performed - Deviate
2004-07-25 Direction Drilling Operation Performed - Deviate
2004-08-07 Finished Drilling
2004-08-07 Well Mode changed to Drilled and Cased
2004-08-08 Well Log Performed
2004-08-10 Liner Casing Operation Performed
2004-08-14 Rig Released
2004-11-01 Well Log Performed
2004-11-02 Well Log Performed
2004-11-04 Well Log Performed
2004-11-05 Well Log Performed
2004-11-13 Well Log Performed
2004-11-15 Well Log Performed
2004-11-20 Well Log Performed
2004-11-21 Perforation Treatment Performed - Jet Perforation
2004-11-21 Well Log Performed
2004-11-26 Perforation Treatment Performed - Fractured
2004-12-01 Perforation Treatment Performed - Jet Perforation
2004-12-02 Perforation Treatment Performed - Jet Perforation
2004-12-02 Well Log Performed
2004-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-12-13 Well Fluid changed to Gas
2004-12-13 Well Mode changed to Testing
2008-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-26 Perforation Treatment Performed - Jet Perforation
2008-08-26 Plug Back Performed
2008-08-26 Well Fluid changed to Gas
2008-08-26 Well Mode changed to Abandoned Zone
2008-08-29 Perforation Treatment Performed - Remedial Casing
2008-08-30 Perforation Treatment Performed - Jet Perforation
2008-08-31 Perforation Treatment Performed - Remedial Casing
2008-09-01 Perforation Treatment Performed - Jet Perforation
2008-09-02 Perforation Treatment Performed - Remedial Casing
2008-09-03 Perforation Treatment Performed - Jet Perforation
2008-09-04 Perforation Treatment Performed - Remedial Casing
2008-09-06 Well Abandoned
2008-09-06 Well Fluid changed to Gas
2008-09-06 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-02-21 908.00 Sidetrack fish
2004-07-02 3997.00 Deviate (5 - 79 degrees)
2004-07-25 4111.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-11-21 Perforation 3811.00 3817.00 17
2008-08-30 Perforation 1255.00 1256.00 20
2008-08-31 Remedial Casing Cementing 1255.00 1256.00 0
2008-09-01 Perforation 1090.00 1091.00 20
2008-09-02 Remedial Casing Cementing 1090.00 1091.00 0
2008-09-03 Perforation 600.00 601.00 20
2008-09-04 Remedial Casing Cementing 600.00 601.00 0
2004-11-26 Fracture 3811.00 3817.00 0
2004-12-01 Perforation 3838.00 3841.00 20
2004-12-02 Perforation 3835.00 3838.00 20
2004-12-02 Perforation 3832.00 3835.00 20
2004-12-08 Acid Treatment 3832.00 3841.00 0
2008-08-26 Packing Device Capped w/Cement 3784.60 3792.60 0
2008-08-26 Perforation 2390.00 2391.00 20
2008-08-29 Remedial Casing Cementing 2390.00 2391.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 32 0.0 0.0 0.0

For data sources see[6]

References