If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0596092514004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.133197,"lon":-119.21708,"icon":""}]} |
Location: 00/14-25-059-09W6/4 | |
Location Alias: 00/14-25-59-09 W6M | |
Location Alias 2: 00/14-25-059-09 W6/04 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 6 | |
Range: 09 | |
Section: 25 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: PANTERRA RES GRDCACH 14-25-59-9 | |
Operator Name: Pieridae Alberta Production Ltd. | |
License Number: 0217303 | |
License Date: 1998-08-31 | |
License Status: Suspension | |
Spud Date: 1998-11-14 | |
Final Drill Date: 1999-09-08 | |
Well Total Depth: 4493.00 m | |
Surface Hole Latitude: 54.133197 | |
Surface Hole Longitude: -119.217080 |
Date | Event |
---|---|
1998-08-31 | Obtained License |
1998-11-30 | Surface Casing Operation Performed |
1999-01-07 | Well Log Performed |
1999-01-16 | Plug Back Performed |
1999-01-21 | Direction Drilling Operation Performed - Sidetrack Fish |
1999-01-24 | Plug Back Performed |
1999-01-27 | Direction Drilling Operation Performed - Sidetrack Fish |
1999-07-15 | Well Log Performed |
1999-07-25 | Intermediate Casing Operation Performed |
1999-08-01 | Well Log Performed |
1999-09-08 | Finished Drilling |
1999-09-10 | Well Log Performed |
1999-09-11 | Well Log Performed |
1999-09-17 | Well Log Performed |
1999-09-23 | Liner Casing Operation Performed |
1999-10-05 | Rig Released |
1999-10-09 | Perforation Treatment Performed - Jet Perforation |
1999-10-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-10-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-10-21 | Perforation Treatment Performed - Jet Perforation |
1999-10-24 | Perforation Treatment Performed - Cement Plug |
1999-10-24 | Plug Back Performed |
1999-10-26 | Perforation Treatment Performed - Cement Plug |
1999-10-26 | Plug Back Performed |
1999-10-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-10-29 | Plug Back Performed |
1999-10-30 | Perforation Treatment Performed - Jet Perforation |
1999-11-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-11-17 | Perforation Treatment Performed - Fractured |
1999-11-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-11-30 | Plug Back Performed |
1999-12-01 | Perforation Treatment Performed - Jet Perforation |
1999-12-01 | Well Mode changed to Drilled and Cased |
1999-12-06 | Perforation Treatment Performed - Jet Perforation |
1999-12-08 | Perforation Treatment Performed - Cement Squeeze |
1999-12-09 | Perforation Treatment Performed - Jet Perforation |
1999-12-10 | Perforation Treatment Performed - Cement Squeeze |
1999-12-10 | Perforation Treatment Performed - Chemical Squeeze |
1999-12-12 | Perforation Treatment Performed - Cement Squeeze |
1999-12-18 | Perforation Treatment Performed - Jet Perforation |
1999-12-20 | Perforation Treatment Performed - Fractured |
2000-01-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-01-05 | Perforation Treatment Performed - Jet Perforation |
2000-01-05 | Plug Back Performed |
2000-01-05 | Well Mode changed to Abandoned Zone |
2000-01-07 | Perforation Treatment Performed - Fractured |
2000-01-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-01-12 | Plug Back Performed |
2000-01-13 | Perforation Treatment Performed - Jet Perforation |
2000-01-18 | Perforation Treatment Performed - Fractured |
2000-01-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-01-24 | Perforation Treatment Performed - Jet Perforation |
2000-01-24 | Plug Back Performed |
2000-01-26 | Perforation Treatment Performed - Fractured |
2000-02-04 | Perforation Treatment Performed - Cement Squeeze |
2000-02-08 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1999-01-21 | 1925.00 | Sidetrack fish |
1999-01-27 | 1915.00 | Sidetrack fish |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-10-09 | Perforation | 4243.00 | 4266.00 | 13 |
1999-10-30 | Perforation | 3804.50 | 3805.00 | 16 |
1999-10-30 | Perforation | 3812.00 | 3815.00 | 16 |
1999-10-30 | Perforation | 3819.00 | 3832.30 | 16 |
1999-11-09 | Acid Treatment | 3801.00 | 3832.30 | 0 |
1999-11-17 | Fracture | 3801.00 | 3832.30 | 0 |
1999-11-30 | Packing Device Capped w/Cement | 3622.00 | 3630.00 | 0 |
1999-12-01 | Perforation | 3078.00 | 3091.00 | 18 |
1999-12-06 | Perforation | 3126.00 | 3126.30 | 18 |
1999-12-08 | Cement Squeeze | 3078.00 | 3126.30 | 0 |
1999-12-09 | Perforation | 2350.00 | 2350.30 | 18 |
1999-10-13 | Acid Treatment | 4243.00 | 4266.00 | 0 |
1999-12-09 | Perforation | 3055.00 | 3055.30 | 18 |
1999-12-10 | Chemical Squeeze | 3055.00 | 3055.30 | 0 |
1999-12-10 | Cement Squeeze | 3055.00 | 3055.30 | 0 |
1999-12-12 | Cement Squeeze | 2350.00 | 2350.30 | 0 |
1999-12-12 | Cement Squeeze | 2350.00 | 2350.30 | 0 |
1999-12-18 | Perforation | 3078.00 | 3091.00 | 18 |
1999-12-20 | Fracture | 3078.00 | 3091.00 | 0 |
2000-01-05 | Packing Device Capped w/Cement | 3045.00 | 3053.00 | 0 |
2000-01-05 | Perforation | 3014.00 | 3023.00 | 18 |
2000-01-07 | Fracture | 3014.00 | 3023.00 | 0 |
1999-10-17 | Acid Treatment | 4243.00 | 4266.00 | 0 |
2000-01-12 | Packing Device Capped w/Cement | 2996.00 | 3004.00 | 0 |
2000-01-13 | Perforation | 2469.00 | 2480.00 | 18 |
2000-01-18 | Fracture | 2469.00 | 2480.00 | 0 |
2000-01-24 | Packing Device Capped w/Cement | 2457.00 | 2465.00 | 0 |
2000-01-24 | Perforation | 2433.00 | 2442.00 | 17 |
2000-01-26 | Fracture | 2433.00 | 2442.00 | 0 |
2000-02-04 | Cement Squeeze | 2350.00 | 2350.50 | 0 |
2000-02-08 | Perforation | 2469.00 | 2480.00 | 17 |
1999-10-21 | Perforation | 4306.00 | 4309.00 | 13 |
1999-10-21 | Perforation | 4469.00 | 4472.00 | 13 |
1999-10-24 | Cement Plug | 4297.00 | 4493.00 | 0 |
1999-10-26 | Cement Plug | 4266.00 | 4297.00 | 0 |
1999-10-29 | Packing Device Capped w/Cement | 4123.40 | 4175.00 | 0 |
1999-10-30 | Perforation | 3801.00 | 3802.00 | 16 |
For data sources see[5]