If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0604052913A00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.221589,"lon":-110.725476,"icon":""}]} |
Location: A0/13-29-060-05W4/0 | |
Location Alias: A0/13-29-60-05 W4M | |
Location Alias 2: A0/13-29-060-05 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 4 | |
Range: 05 | |
Section: 29 | |
County/Municipality: Municipal District of Bonnyville No. 87 | |
Well Name: COGI BVILLE 13-29-60-5 | |
Operator Name: Canadian Oil & Gas International Inc. | |
License Number: 0003182 | |
License Date: 1951-07-14 | |
License Status: Abandoned | |
Spud Date: 1951-07-17 | |
Final Drill Date: 1951-07-30 | |
Well Total Depth: 462.10 m | |
Surface Hole Latitude: 54.221589 | |
Surface Hole Longitude: -110.725476 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-07-14 | Obtained License |
1951-07-30 | Drill Stem Test Performed |
1951-07-30 | Finished Drilling |
1951-07-30 | Production Casing Operation Performed |
1951-08-04 | Perforation Treatment Performed - Bullet Perforation |
1951-08-14 | Perforation Treatment Performed - Bullet Perforation |
1951-08-19 | Well Mode changed to Drilled and Cased |
1975-02-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-02-23 | Perforation Treatment Performed - Jet Perforation |
1975-02-28 | Perforation Treatment Performed - Steam Injection |
1975-11-01 | Well Fluid changed to Gas |
1975-11-01 | Well Mode changed to Testing |
2008-07-09 | Well Log Performed |
2008-10-08 | Perforation Treatment Performed - Jet Perforation |
2008-10-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-10-10 | Perforation Treatment Performed - Cement Plug |
2008-10-10 | Plug Back Performed |
2008-10-10 | Well Fluid changed to Gas |
2008-10-10 | Well Mode changed to Abandoned Zone |
2008-10-14 | Perforation Treatment Performed - Jet Perforation |
2008-10-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-10-16 | Perforation Treatment Performed - Jet Perforation |
2008-10-16 | Well Log Performed |
2008-10-17 | Well Log Performed |
2008-10-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-10-20 | Well Log Performed |
2008-10-23 | Well Log Performed |
2008-10-24 | Perforation Treatment Performed - Jet Perforation |
2008-10-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-11-25 | Well Abandoned |
2008-11-25 | Well Fluid changed to Gas |
2008-11-25 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-08-04 | Bullet Perforation | 363.00 | 368.50 | 26 |
2008-10-14 | Perforation | 219.00 | 220.00 | 17 |
2008-10-15 | Packing Device Capped w/Cement | 200.00 | 217.00 | 0 |
2008-10-16 | Perforation | 166.00 | 167.00 | 17 |
2008-10-20 | Packing Device Capped w/Cement | 152.00 | 164.00 | 0 |
2008-10-24 | Perforation | 40.00 | 41.00 | 17 |
2008-10-26 | Packing Device Capped w/Cement | 40.00 | 43.30 | 0 |
1951-08-14 | Bullet Perforation | 351.70 | 353.00 | 13 |
1975-02-21 | Acid Treatment | 351.70 | 368.50 | 0 |
1975-02-23 | Perforation | 350.50 | 351.70 | 13 |
1975-02-28 | Steam Injection | 350.50 | 368.50 | 0 |
2008-10-08 | Perforation | 321.00 | 322.00 | 17 |
2008-10-10 | Cement Plug | 363.00 | 374.00 | 0 |
2008-10-10 | Packing Device Capped w/Cement | 332.00 | 361.00 | 0 |
2008-10-10 | Packing Device Capped w/Cement | 301.00 | 319.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1975 | 1632 | 0.0 | 0.0 | 0.0 |
1976 | 504 | 0.0 | 0.0 | 0.0 |
For data sources see[5]