If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0605011910020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.203573,"lon":-114.134867,"icon":""}]} |
| Location: 02/10-19-060-01W5/0 | |
| Location Alias: 02/10-19-60-01 W5M | |
| Location Alias 2: 02/10-19-060-01 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 060 | |
| Meridian: 5 | |
| Range: 01 | |
| Section: 19 | |
| County/Municipality: Westlock County | |
| Well Name: REMINGTON BCRIC WESTLOCK 10-19-60-1 | |
| Operator Name: 1333002 Alberta Ltd. | |
| License Number: 0077915 | |
| License Date: 1979-09-07 | |
| License Status: Re-Entered | |
| Spud Date: 1979-09-27 | |
| Final Drill Date: 1979-10-02 | |
| Well Total Depth: 825.00 m | |
| Surface Hole Latitude: 54.203573 | |
| Surface Hole Longitude: -114.134867 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1979-09-07 | Obtained License |
| 1979-10-02 | Drill Stem Test Performed |
| 1979-10-02 | Finished Drilling |
| 1979-10-02 | Well Log Performed |
| 1979-10-04 | Production Casing Operation Performed |
| 1979-10-24 | Perforation Treatment Performed - Jet Perforation |
| 1979-10-27 | Well Mode changed to Drilled and Cased |
| 1986-01-09 | Well Began Production |
| 1986-01-09 | Well Fluid changed to Gas |
| 1986-01-09 | Well Mode changed to Flowing |
| 1995-10-28 | Well Fluid changed to Gas |
| 1995-10-28 | Well Mode changed to Suspended |
| 1997-07-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1997-07-12 | Perforation Treatment Performed - Cement Squeeze |
| 1997-07-12 | Perforation Treatment Performed - Jet Perforation |
| 1997-07-12 | Perforation Treatment Performed - Remedial Casing |
| 1997-07-12 | Plug Back Performed |
| 1997-07-16 | Well Abandoned |
| 1997-07-16 | Well Fluid changed to Gas |
| 1997-07-16 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1979-10-24 | Perforation | 790.50 | 791.50 | 7 |
| 1979-10-24 | Perforation | 792.00 | 793.90 | 7 |
| 1997-07-12 | Cement Squeeze | 790.50 | 793.90 | 0 |
| 1997-07-12 | Packing Device Capped w/Cement | 723.00 | 783.00 | 0 |
| 1997-07-12 | Perforation | 290.00 | 291.00 | 14 |
| 1997-07-12 | Remedial Casing Cementing | 290.00 | 291.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1986 | 7434 | 0.0 | 0.0 | 0.0 |
| 1987 | 8028 | 0.0 | 0.0 | 0.0 |
| 1988 | 7514 | 0.0 | 0.0 | 0.0 |
| 1989 | 8440 | 0.0 | 0.0 | 0.0 |
| 1990 | 8717 | 0.0 | 0.0 | 0.0 |
| 1991 | 8653 | 0.0 | 0.0 | 0.0 |
| 1992 | 8410 | 0.0 | 0.0 | 0.0 |
| 1993 | 8698 | 0.0 | 0.0 | 0.0 |
| 1994 | 8747 | 0.0 | 0.0 | 0.0 |
| 1995 | 1399 | 0.0 | 0.0 | 0.0 |
For data sources see[5]