X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605150103002

Well Details

Well ID: 0605150103002
Loading map...
Location: 00/03-01-060-15W5/2
Location Alias: 00/03-01-60-15 W5M
Location Alias 2: 00/03-01-060-15 W5/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 15
Section: 01
County/Municipality: Woodlands County
Well Name: TIDEWATER WIND 6-1-60-15
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0013524
License Date: 1957-06-11
License Status: Suspension
Spud Date: 1957-06-20
Final Drill Date: 1957-11-02
Well Total Depth: 2677.70 m
Surface Hole Latitude: 54.157805
Surface Hole Longitude: -116.117018

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-06-11 Obtained License
1957-06-20 Direction Drilling Operation Performed - 98
1957-07-03 Drill Stem Test Performed
1957-07-05 Drill Stem Test Performed
1957-07-13 Drill Stem Test Performed
1957-10-09 Liner Casing Operation Performed
1957-11-02 Finished Drilling
1957-12-16 Well Mode changed to Drilled and Cased
1958-06-23 Perforation Treatment Performed - Jet Perforation
1961-07-06 Perforation Treatment Performed - Bullet Perforation
1961-07-08 Perforation Treatment Performed - Bullet Perforation
1962-04-25 Well Began Production
1962-04-25 Well Fluid changed to Gas
1962-04-25 Well Mode changed to Flowing
1986-02-10 Perforation Treatment Performed - Cement Squeeze
1986-02-11 Perforation Treatment Performed - Jet Perforation
1986-02-13 Perforation Treatment Performed - Fractured
2011-09-01 Well Fluid changed to Gas
2011-09-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1957-06-20 1912.60 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-06-23 Perforation 2569.50 2572.50 13
1961-07-08 Bullet Perforation 2567.60 2569.50 7
1986-02-10 Cement Squeeze 2610.60 2621.30 0
1986-02-11 Perforation 2568.00 2585.00 13
1986-02-13 Fracture 2567.60 2599.90 0
1961-07-06 Bullet Perforation 2618.20 2621.30 7
1961-07-08 Bullet Perforation 2615.20 2621.30 7
1961-07-08 Bullet Perforation 2610.60 2615.20 7
1961-07-08 Bullet Perforation 2593.80 2599.90 7
1961-07-08 Bullet Perforation 2587.80 2593.80 7
1961-07-08 Bullet Perforation 2581.70 2587.80 7
1961-07-08 Bullet Perforation 2575.60 2581.70 7
1961-07-08 Bullet Perforation 2572.50 2575.60 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1405 0.0 0.0 0.0
1969 7966 0.0 0.0 0.0
1970 7648 0.0 0.0 0.0
1971 5931 0.0 0.0 0.0
1972 7954 0.0 0.0 0.0
1973 6043 0.0 0.0 0.0
1974 7972 0.0 0.0 0.0
1975 2688 0.0 0.0 0.0
1976 3570 0.0 0.0 0.0
1977 3797 0.0 0.0 0.0
1978 5452 0.0 0.0 0.0
1979 3656 0.0 0.0 0.0
1980 7910 0.0 0.0 0.0
1981 8336 0.0 0.0 0.0
1982 7987 0.0 0.0 0.0
1983 8302 0.0 0.0 0.0
1984 7840 0.0 0.0 0.0
1985 8711 0.0 0.0 0.0
1986 7271 0.0 0.0 0.0
1987 8648 0.0 0.0 0.0
1988 6712 0.0 0.0 0.0
1989 6613 0.0 0.0 0.0
1990 8642 0.0 0.0 0.0
1991 6805 0.0 0.0 0.0
1992 7705 0.0 0.0 0.0
1993 7541 0.0 0.0 0.0
1994 1127 0.0 0.0 0.0
1996 12 0.0 0.0 0.0
2002 1 0.0 0.0 0.0
2005 144 0.0 0.0 0.0

For data sources see[6]

References