X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605150103022

Well Details

Well ID: 0605150103022
Loading map...
Location: 02/03-01-060-15W5/2
Location Alias: 02/03-01-60-15 W5M
Location Alias 2: 02/03-01-060-15 W5/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 15
Section: 01
County/Municipality: Woodlands County
Well Name: TIDEWATER WIND 3-1-60-15
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0221846
License Date: 1999-03-01
License Status: Suspension
Spud Date: 1999-03-15
Final Drill Date: 1999-03-25
Well Total Depth: 2000.00 m
Surface Hole Latitude: 54.155800
Surface Hole Longitude: -116.119261

For data sources see[1][2]

Well History

Date Event
1999-03-01 Obtained License
1999-03-16 Surface Casing Operation Performed
1999-03-25 Finished Drilling
1999-03-25 Well Log Performed
1999-03-25 Well Mode changed to Drilled and Cased
1999-03-26 Production Casing Operation Performed
1999-03-26 Well Log Performed
1999-03-27 Rig Released
1999-04-02 Perforation Treatment Performed - Jet Perforation
1999-04-02 Well Log Performed
1999-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-04-03 Perforation Treatment Performed - Acid Wash - No Pressure
1999-04-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-04-04 Plug Back Performed
1999-04-05 Perforation Treatment Performed - Jet Perforation
1999-04-05 Well Log Performed
1999-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-04-06 Perforation Treatment Performed - Acid Wash - No Pressure
1999-04-07 Well Log Performed
1999-04-08 Perforation Treatment Performed - Cement Squeeze
1999-04-09 Perforation Treatment Performed - Jet Perforation
1999-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-04-10 Perforation Treatment Performed - Acid Wash - No Pressure
1999-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-04-16 Perforation Treatment Performed - Jet Perforation
1999-04-16 Well Log Performed
1999-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-09-11 Plug Back Performed
2007-09-11 Well Log Performed
2007-09-12 Perforation Treatment Performed - Jet Perforation
2007-09-12 Well Log Performed
2007-10-22 Well Began Production
2007-10-22 Well Fluid changed to Gas
2007-10-22 Well Mode changed to Flowing
2018-01-31 Well Fluid changed to Gas
2018-01-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-04-02 Perforation 1955.00 1956.00 13
1999-04-09 Perforation 1905.00 1906.00 13
1999-04-10 Acid Treatment 1905.00 1906.00 0
1999-04-10 Acid Wash 1905.00 1906.00 0
1999-04-12 Acid Treatment 1905.00 1906.00 0
1999-04-13 Acid Treatment 1905.00 1906.00 0
1999-04-16 Perforation 1889.00 1890.00 13
1999-04-17 Acid Treatment 1889.00 1890.00 0
2007-09-11 Packing Device Capped w/Cement 1877.00 1885.00 0
2007-09-12 Perforation 1836.00 1839.00 17
1999-04-02 Perforation 1961.00 1963.50 13
1999-04-03 Acid Treatment 1955.00 1963.50 0
1999-04-03 Acid Wash 1955.00 1963.50 0
1999-04-04 Packing Device Capped w/Cement 1942.00 1950.00 0
1999-04-05 Perforation 1913.00 1915.00 13
1999-04-06 Acid Treatment 1913.00 1915.00 0
1999-04-06 Acid Wash 1913.00 1915.00 0
1999-04-08 Cement Squeeze 1913.00 1915.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 1667 0.0 0.0 0.0
2008 7932 0.0 0.0 0.0
2009 7649 0.0 0.0 0.0
2010 5258 0.0 0.0 0.0
2011 5610 0.0 0.0 0.0
2012 5873 0.0 0.0 0.0

For data sources see[5]

References