If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0605150513003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.164909,"lon":-116.223068,"icon":""}]} |
Location: 00/13-05-060-15W5/3 | |
Location Alias: 00/13-05-60-15 W5M | |
Location Alias 2: 00/13-05-060-15 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 5 | |
Range: 15 | |
Section: 05 | |
County/Municipality: Woodlands County | |
Well Name: TIDEWATER WIND 13-5-60-15 | |
Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
License Number: 0032689 | |
License Date: 1967-08-31 | |
License Status: Abandoned | |
Spud Date: 1967-09-06 | |
Final Drill Date: 1967-09-28 | |
Well Total Depth: 2659.40 m | |
Surface Hole Latitude: 54.164909 | |
Surface Hole Longitude: -116.223068 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1967-08-31 | Obtained License |
1967-09-28 | Finished Drilling |
1967-09-28 | Well Mode changed to Drilled and Cased |
1967-09-29 | Production Casing Operation Performed |
1967-11-10 | Perforation Treatment Performed - Jet Perforation |
1967-11-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-11-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1972-10-18 | Perforation Treatment Performed - Cement Squeeze |
1972-10-20 | Perforation Treatment Performed - Jet Perforation |
1972-11-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-05-17 | Perforation Treatment Performed - Jet Perforation |
1976-05-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-06-01 | Well Fluid changed to Gas |
1976-06-01 | Well Mode changed to Testing |
1976-06-14 | Perforation Treatment Performed - Jet Perforation |
1976-06-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-07-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-08-09 | Perforation Treatment Performed - Cement Squeeze |
1976-08-10 | Perforation Treatment Performed - Jet Perforation |
1976-08-12 | Perforation Treatment Performed - Cement Squeeze |
2001-02-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-02-10 | Plug Back Performed |
2001-02-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-02-13 | Plug Back Performed |
2001-02-13 | Well Fluid changed to Gas |
2001-02-13 | Well Mode changed to Abandoned Zone |
2001-02-14 | Well Log Performed |
2002-06-05 | Well Abandoned |
2002-06-05 | Well Fluid changed to Gas |
2002-06-05 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1967-11-10 | Perforation | 2606.00 | 2609.10 | 7 |
1976-06-16 | Acid Treatment | 1975.40 | 1984.20 | 0 |
1976-07-26 | Acid Treatment | 1975.40 | 1984.20 | 0 |
1976-08-09 | Cement Squeeze | 1975.40 | 1984.20 | 0 |
1976-08-10 | Perforation | 1951.60 | 1954.40 | 7 |
1976-08-12 | Cement Squeeze | 1951.60 | 1954.40 | 0 |
2001-02-10 | Packing Device Capped w/Cement | 2536.00 | 2554.00 | 0 |
2001-02-13 | Packing Device Capped w/Cement | 1962.00 | 1970.00 | 0 |
2001-02-13 | Packing Device Capped w/Cement | 1937.00 | 1945.00 | 0 |
1967-11-15 | Acid Treatment | 2606.00 | 2609.10 | 0 |
1967-11-16 | Acid Treatment | 2606.00 | 2609.10 | 0 |
1972-10-18 | Cement Squeeze | 2606.00 | 2609.10 | 0 |
1972-10-20 | Perforation | 2597.20 | 2599.00 | 13 |
1972-11-02 | Acid Treatment | 2597.20 | 2599.00 | 0 |
1976-05-17 | Perforation | 1975.40 | 1979.40 | 7 |
1976-05-18 | Acid Treatment | 1975.40 | 1979.40 | 0 |
1976-06-14 | Perforation | 1981.20 | 1984.20 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 19 | 0.0 | 0.0 | 0.0 |
For data sources see[5]