If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0605153001003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.209728,"lon":-116.228661,"icon":""}]} |
Location: 00/01-30-060-15W5/3 | |
Location Alias: 00/01-30-60-15 W5M | |
Location Alias 2: 00/01-30-060-15 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 5 | |
Range: 15 | |
Section: 30 | |
County/Municipality: Woodlands County | |
Well Name: TIDEWATER WIND 1-30-60-15 | |
Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
License Number: 0242842 | |
License Date: 2000-10-05 | |
License Status: Suspension | |
Spud Date: 2000-10-28 | |
Final Drill Date: 2000-11-30 | |
Well Total Depth: 2737.00 m | |
Surface Hole Latitude: 54.209728 | |
Surface Hole Longitude: -116.228661 |
Date | Event |
---|---|
2000-10-05 | Obtained License |
2000-10-30 | Surface Casing Operation Performed |
2000-11-07 | Direction Drilling Operation Performed - Deviate |
2000-11-16 | Intermediate Casing Operation Performed |
2000-11-25 | Direction Drilling Operation Performed - Horizontal |
2000-11-28 | Well Log Performed |
2000-11-30 | Finished Drilling |
2000-11-30 | Well Log Performed |
2000-11-30 | Well Mode changed to Drilled and Cased |
2000-12-01 | Liner Casing Operation Performed |
2000-12-01 | Perforation Treatment Performed - Open-Hole Completion |
2000-12-06 | Rig Released |
2005-08-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-08-03 | Plug Back Performed |
2005-08-04 | Perforation Treatment Performed - Jet Perforation |
2005-08-05 | Perforation Treatment Performed - Fractured |
2005-08-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-08-09 | Plug Back Performed |
2005-08-09 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2000-11-07 | 2149.00 | Deviate (5 - 79 degrees) |
2000-11-25 | 2514.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-12-01 | Open Hole/Barefoot Completion | 2596.50 | 2737.00 | 0 |
2005-08-03 | Packing Device Capped w/Cement | 2389.00 | 2397.00 | 0 |
2005-08-04 | Perforation | 1738.00 | 1742.00 | 14 |
2005-08-05 | Fracture | 1738.00 | 1742.00 | 0 |
2005-08-09 | Packing Device Capped w/Cement | 1725.00 | 1733.00 | 0 |
For data sources see[5]