X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605170216020

Well Details

Well ID: 0605170216020
Loading map...
Location: 02/16-02-060-17W5/0
Location Alias: 02/16-02-60-17 W5M
Location Alias 2: 02/16-02-060-17 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 17
Section: 02
County/Municipality: Woodlands County
Well Name: TANGLE CREEK KAYBOBS 16-2-60-17
Operator Name: Tangle Creek Energy Ltd.
License Number: 0447668
License Date: 2012-08-09
License Status: Issued
Spud Date: 2012-08-17
Final Drill Date: 2012-08-24
Well Total Depth: 3113.00 m
Surface Hole Latitude: 54.165188
Surface Hole Longitude: -116.453721

For data sources see[1][2]

Well History

Date Event
2012-08-09 Obtained License
2012-08-18 Surface Casing Operation Performed
2012-08-20 Direction Drilling Operation Performed - Deviate
2012-08-21 Direction Drilling Operation Performed - Horizontal
2012-08-24 Finished Drilling
2012-08-24 Well Mode changed to Drilled and Cased
2012-08-26 Production Casing Operation Performed
2012-08-27 Rig Released
2012-09-05 Well Log Performed
2012-09-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-09 Perforation Treatment Performed - Open-Hole Completion
2012-09-09 Well Began Production
2012-09-09 Well Fluid changed to Crude Oil
2012-09-09 Well Mode changed to Flowing
2012-10-09 Well Fluid changed to Crude Oil
2012-10-09 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-17 Trinidad Drilling Ltd. 22 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-20 1313.30 Deviate (5 - 79 degrees)
2012-08-21 1706.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-09 Open Hole/Barefoot Completion 3105.00 3113.00 0
2012-09-09 Multi-Stage Fracture 2477.10 2477.20 0
2012-09-09 Multi-Stage Fracture 2404.10 2404.20 0
2012-09-09 Multi-Stage Fracture 2330.80 2330.90 0
2012-09-09 Multi-Stage Fracture 2247.30 2247.40 0
2012-09-09 Multi-Stage Fracture 2174.40 2174.50 0
2012-09-09 Multi-Stage Fracture 2103.00 2103.10 0
2012-09-09 Multi-Stage Fracture 2029.60 2029.70 0
2012-09-09 Multi-Stage Fracture 1945.50 1945.60 0
2012-09-09 Multi-Stage Fracture 1873.00 1873.10 0
2012-09-09 Multi-Stage Fracture 1810.20 1810.30 0
2012-09-09 Multi-Stage Fracture 3029.90 3030.00 0
2012-09-09 Multi-Stage Fracture 2994.80 2994.90 0
2012-09-09 Multi-Stage Fracture 2921.80 2921.90 0
2012-09-09 Multi-Stage Fracture 2849.10 2849.20 0
2012-09-09 Multi-Stage Fracture 2777.80 2777.90 0
2012-09-09 Multi-Stage Fracture 2693.80 2693.90 0
2012-09-09 Multi-Stage Fracture 2621.60 2621.70 0
2012-09-09 Multi-Stage Fracture 2549.80 2549.90 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2173 0.0 0.0 0.0
2013 8690 0.0 0.0 0.0
2014 8719 0.0 0.0 0.0
2015 8683 0.0 0.0 0.0
2016 8633 0.0 0.0 0.0
2017 8195 0.0 0.0 0.0
2018 8193 0.0 0.0 0.0
2019 8079 0.0 0.0 0.0
2020 2143 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-17 No Incident Encountered 0.00 0.00
2012-08-30 No Incident Encountered 0.00 0.00

For data sources see[8]

References