If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0605170804000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.171929,"lon":-116.499831,"icon":""}]} |
| Location: 00/04-08-060-17W5/0 | |
| Location Alias: 00/04-08-60-17 W5M | |
| Location Alias 2: 00/04-08-060-17 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 060 | |
| Meridian: 5 | |
| Range: 17 | |
| Section: 08 | |
| County/Municipality: Woodlands County | |
| Well Name: TANGLE CREEK KAYBOBS 4-8-60-17 | |
| Operator Name: Tangle Creek Energy Ltd. | |
| License Number: 0485649 | |
| License Date: 2017-10-02 | |
| License Status: Issued | |
| Spud Date: 2017-11-11 | |
| Final Drill Date: 2017-11-19 | |
| Well Total Depth: 3164.00 m | |
| Surface Hole Latitude: 54.171929 | |
| Surface Hole Longitude: -116.499831 |
| Date | Event |
|---|---|
| 2017-10-02 | Obtained License |
| 2017-11-12 | Surface Casing Operation Performed |
| 2017-11-14 | Direction Drilling Operation Performed - Deviate |
| 2017-11-15 | Direction Drilling Operation Performed - Horizontal |
| 2017-11-19 | Finished Drilling |
| 2017-11-19 | Production Casing Operation Performed |
| 2017-11-19 | Well Mode changed to Drilled and Cased |
| 2017-11-20 | Rig Released |
| 2017-12-10 | Well Log Performed |
| 2017-12-14 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-12-14 | Perforation Treatment Performed - Open-Hole Completion |
| 2017-12-15 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-12-20 | Well Began Production |
| 2017-12-20 | Well Fluid changed to Crude Oil |
| 2017-12-20 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-11-11 | Trinidad Drilling Ltd. | 22 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-11-14 | 1278.00 | Deviate (5 - 79 degrees) |
| 2017-11-15 | 1750.30 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-12-14 | Open Hole/Barefoot Completion | 3163.00 | 3164.00 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2760.20 | 2760.30 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2715.70 | 2715.80 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2671.60 | 2671.70 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2627.60 | 2627.70 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2582.80 | 2582.90 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2539.10 | 2539.20 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2495.60 | 2495.70 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2450.40 | 2450.50 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2406.00 | 2406.10 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2362.80 | 2362.90 | 0 |
| 2017-12-14 | Multi-Stage Fracture | 3117.30 | 3117.40 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2317.50 | 2317.60 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2274.00 | 2274.10 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2230.50 | 2230.60 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2199.20 | 2199.30 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2166.90 | 2167.00 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2135.10 | 2135.20 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2103.30 | 2103.40 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2071.40 | 2071.50 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2041.00 | 2041.10 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2008.80 | 2008.90 | 0 |
| 2017-12-14 | Multi-Stage Fracture | 3071.90 | 3072.00 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 1977.80 | 1977.90 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 1945.80 | 1945.90 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 1914.40 | 1914.50 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 1884.90 | 1885.00 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 1853.50 | 1853.60 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 1822.40 | 1822.50 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 1791.80 | 1791.90 | 0 |
| 2017-12-14 | Multi-Stage Fracture | 3026.60 | 3026.70 | 0 |
| 2017-12-14 | Multi-Stage Fracture | 2982.70 | 2982.80 | 0 |
| 2017-12-14 | Multi-Stage Fracture | 2939.20 | 2939.30 | 0 |
| 2017-12-14 | Multi-Stage Fracture | 2894.80 | 2894.90 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2849.50 | 2849.60 | 0 |
| 2017-12-15 | Multi-Stage Fracture | 2804.20 | 2804.30 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-12-14 | 2017-12-15 | 1,616 | 5,537 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Nitrogen | Not Available | 100 | 7.3308 | N/A | |||
| Water | 7732-18-5 | 100 | 83.0524 | N/A | ||||
| 30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 12.1918 | N/A | ||
| 15% HCl Acid | Step Energy Services | Acid | Hydrochloric Acid | 7647-01-0 | 100 | 0.5354 | N/A | |
| Water | 7732-18-5 | 100 | 0.5354 | N/A | ||||
| Econocide B1008 (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0087 | N/A | |
| Methyl Alcohol | 67-56-1 | 100 | 0.0087 | N/A | ||||
| Non-Hazardous Ingredients | Not Available | 100 | 0.0087 | N/A | ||||
| SCS-8 (Clay Control) | Step Energy Services | Clay Control | Inorganic Salt | Not Available | 100 | 0.1138 | N/A | |
| SCI-9 (Corrosion Inhibitor) | Step Energy Services | Corrosion Inhibitor | Acetophenone. thiourea. formaldehyde polymer | 68527-49-1 | 100 | 0.001 | N/A | |
| Butyl cellosolve | 111-76-2 | 100 | 0.001 | N/A | ||||
| Cinnamaldehyde | 104-55-2 | 100 | 0.001 | N/A | ||||
| Ethylene Glycol | 107-21-1 | 100 | 0.001 | N/A | ||||
| Formic Acid | 64-18-6 | 100 | 0.001 | N/A | ||||
| Methanol | 67-56-1 | 100 | 0.001 | N/A | ||||
| Polyether | Not Available | 100 | 0.001 | N/A | ||||
| SFR-102S (Friction Reducer) | STEP Energy Services | Friction Reducer | Distillates. Petroleum. Hydrotreated Light | 64742-47-8 | 100 | 0.0386 | N/A | |
| Proprietary | Trade Secret | 100 | 0.0386 | N/A | ||||
| SIC-2 (Iron Chelator) | Step Energy Services | Iron Control | Trisodium nitriloacetate | 5064-31-3 | 100 | 0.0026 | N/A | |
| Water | 7732-18-5 | 100 | 0.0026 | N/A | ||||
| SAS-4 (Anti-Sludge) | Step Energy Services | Surfactant | 1.1' - Oxybisbenzene. tetrapropylene dervis. sulfonated | 119345-03-8 | 100 | 0.0026 | N/A | |
| Alkylbenzene sulfonic acid | 27176-87-0 | 100 | 0.0026 | N/A | ||||
| Methanol | 67-56-1 | 100 | 0.0026 | N/A | ||||
| Xylene | 1330-20-7 | 100 | 0.0026 | N/A | ||||
| SFE-7 (Nano Surfactant) | Step Energy Services | Surfactant | 2-Propanol | 67-63-0 | 100 | 0.0751 | N/A | |
| Non-Hazardous Ingredients | Not Available | 100 | 0.0751 | N/A | ||||
| Terpense and Terpenoids. sweet orange oil | 68647-72-3 | 100 | 0.0751 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-11-25 | 2017-12-12 | Groundwater - Non-saline less than or equal to 150m deep | 3650 |
| 2017-11-28 | 2017-12-11 | Surface Water - Runoff | 1886 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 336 | 0.0 | 0.0 | 0.0 |
| 2018 | 8399 | 0.0 | 0.0 | 0.0 |
| 2019 | 8727 | 0.0 | 0.0 | 0.0 |
| 2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-11-20 | No Incident Encountered | 0.00 | 0.00 |
| 2018-01-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]