If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0605170813020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.179159,"lon":-116.499486,"icon":""}]} |
Location: 02/13-08-060-17W5/0 | |
Location Alias: 02/13-08-60-17 W5M | |
Location Alias 2: 02/13-08-060-17 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 5 | |
Range: 17 | |
Section: 08 | |
County/Municipality: Woodlands County | |
Well Name: TANGLE CREEK KAYBOBS 13-8-60-17 | |
Operator Name: Tangle Creek Energy Ltd. | |
License Number: 0447039 | |
License Date: 2012-07-06 | |
License Status: Issued | |
Spud Date: 2012-09-14 | |
Final Drill Date: 2012-09-21 | |
Well Total Depth: 3092.00 m | |
Surface Hole Latitude: 54.179159 | |
Surface Hole Longitude: -116.499486 |
Date | Event |
---|---|
2012-07-06 | Obtained License |
2012-09-16 | Surface Casing Operation Performed |
2012-09-17 | Direction Drilling Operation Performed - Deviate |
2012-09-18 | Direction Drilling Operation Performed - Horizontal |
2012-09-21 | Finished Drilling |
2012-09-21 | Well Mode changed to Drilled and Cased |
2012-09-24 | Production Casing Operation Performed |
2012-09-24 | Rig Released |
2012-10-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-20 | Perforation Treatment Performed - Open-Hole Completion |
2012-10-22 | Well Began Production |
2012-10-22 | Well Fluid changed to Crude Oil |
2012-10-22 | Well Mode changed to Flowing |
2012-10-24 | Well Log Performed |
2012-11-22 | Well Fluid changed to Crude Oil |
2012-11-22 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-09-14 | Trinidad Drilling Ltd. | 22 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-09-17 | 1307.40 | Deviate (5 - 79 degrees) |
2012-09-18 | 1700.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-20 | Open Hole/Barefoot Completion | 3081.00 | 3092.00 | 0 |
2012-10-20 | Multi-Stage Fracture | 2473.30 | 2473.40 | 0 |
2012-10-20 | Multi-Stage Fracture | 2400.50 | 2400.60 | 0 |
2012-10-20 | Multi-Stage Fracture | 2317.10 | 2317.20 | 0 |
2012-10-20 | Multi-Stage Fracture | 2243.90 | 2244.00 | 0 |
2012-10-20 | Multi-Stage Fracture | 2171.10 | 2171.20 | 0 |
2012-10-20 | Multi-Stage Fracture | 2086.70 | 2086.80 | 0 |
2012-10-20 | Multi-Stage Fracture | 2014.50 | 2014.60 | 0 |
2012-10-20 | Multi-Stage Fracture | 1942.40 | 1942.50 | 0 |
2012-10-20 | Multi-Stage Fracture | 1869.60 | 1869.70 | 0 |
2012-10-20 | Multi-Stage Fracture | 1797.30 | 1797.40 | 0 |
2012-10-20 | Multi-Stage Fracture | 3045.60 | 3045.70 | 0 |
2012-10-20 | Multi-Stage Fracture | 2970.50 | 2970.60 | 0 |
2012-10-20 | Multi-Stage Fracture | 2898.80 | 2898.90 | 0 |
2012-10-20 | Multi-Stage Fracture | 2830.80 | 2830.90 | 0 |
2012-10-20 | Multi-Stage Fracture | 2757.40 | 2757.50 | 0 |
2012-10-20 | Multi-Stage Fracture | 2686.70 | 2686.80 | 0 |
2012-10-20 | Multi-Stage Fracture | 2619.30 | 2619.40 | 0 |
2012-10-20 | Multi-Stage Fracture | 2546.60 | 2546.70 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1274 | 0.0 | 0.0 | 0.0 |
2013 | 8656 | 0.0 | 0.0 | 0.0 |
2014 | 8691 | 0.0 | 0.0 | 0.0 |
2015 | 8461 | 0.0 | 0.0 | 0.0 |
2016 | 8697 | 0.0 | 0.0 | 0.0 |
2017 | 8654 | 0.0 | 0.0 | 0.0 |
2018 | 8125 | 0.0 | 0.0 | 0.0 |
2019 | 8622 | 0.0 | 0.0 | 0.0 |
2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-17 | No Incident Encountered | 0.00 | 0.00 |
2012-09-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]