If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0605170905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.172144,"lon":-116.475082,"icon":""}]} |
| Location: 00/05-09-060-17W5/0 | |
| Location Alias: 00/05-09-60-17 W5M | |
| Location Alias 2: 00/05-09-060-17 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 060 | |
| Meridian: 5 | |
| Range: 17 | |
| Section: 09 | |
| County/Municipality: Woodlands County | |
| Well Name: TANGLE CREEK CHICKDEE 5-9-60-17 | |
| Operator Name: Tangle Creek Energy Ltd. | |
| License Number: 0446950 | |
| License Date: 2012-06-29 | |
| License Status: Issued | |
| Spud Date: 2012-08-02 | |
| Final Drill Date: 2012-08-11 | |
| Well Total Depth: 3110.00 m | |
| Surface Hole Latitude: 54.172144 | |
| Surface Hole Longitude: -116.475082 |
| Date | Event |
|---|---|
| 2012-06-29 | Obtained License |
| 2012-08-03 | Surface Casing Operation Performed |
| 2012-08-05 | Direction Drilling Operation Performed - Deviate |
| 2012-08-07 | Direction Drilling Operation Performed - Horizontal |
| 2012-08-11 | Finished Drilling |
| 2012-08-11 | Well Mode changed to Drilled and Cased |
| 2012-08-14 | Production Casing Operation Performed |
| 2012-08-14 | Rig Released |
| 2012-09-05 | Well Log Performed |
| 2012-10-02 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-02 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-10-10 | Well Began Production |
| 2012-10-10 | Well Fluid changed to Crude Oil |
| 2012-10-10 | Well Mode changed to Flowing |
| 2012-11-10 | Well Fluid changed to Crude Oil |
| 2012-11-10 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-08-02 | Trinidad Drilling Ltd. | 22 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-08-05 | 1314.20 | Deviate (5 - 79 degrees) |
| 2012-08-07 | 1686.90 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-10-02 | Open Hole/Barefoot Completion | 3109.00 | 3110.00 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 2488.50 | 2488.60 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 2414.90 | 2415.00 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 2342.50 | 2342.60 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 2270.20 | 2270.30 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 2196.50 | 2196.60 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 2124.30 | 2124.40 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 2051.90 | 2052.00 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 1978.70 | 1978.80 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 1894.70 | 1894.80 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 1810.70 | 1810.80 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 3071.80 | 3071.90 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 2997.40 | 2997.50 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 2925.20 | 2925.30 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 2852.80 | 2852.90 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 2780.90 | 2781.00 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 2708.10 | 2708.20 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 2635.60 | 2635.70 | 0 |
| 2012-10-02 | Multi-Stage Fracture | 2562.10 | 2562.20 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 1412 | 0.0 | 0.0 | 0.0 |
| 2013 | 8587 | 0.0 | 0.0 | 0.0 |
| 2014 | 8755 | 0.0 | 0.0 | 0.0 |
| 2015 | 8338 | 0.0 | 0.0 | 0.0 |
| 2016 | 8681 | 0.0 | 0.0 | 0.0 |
| 2017 | 8134 | 0.0 | 0.0 | 0.0 |
| 2018 | 8162 | 0.0 | 0.0 | 0.0 |
| 2019 | 8282 | 0.0 | 0.0 | 0.0 |
| 2020 | 1947 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-08-02 | No Incident Encountered | 0.00 | 0.00 |
| 2012-09-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]