If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0605172901020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.227061,"lon":-116.512468,"icon":""}]} |
Location: 02/01-29-060-17W5/0 | |
Location Alias: 02/01-29-60-17 W5M | |
Location Alias 2: 02/01-29-060-17 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 5 | |
Range: 17 | |
Section: 29 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TANGLE CREEK KAYBOBS 1-29-60-17 | |
Operator Name: Tangle Creek Energy Ltd. | |
License Number: 0490006 | |
License Date: 2018-07-13 | |
License Status: Issued | |
Spud Date: 2018-07-30 | |
Final Drill Date: 2018-08-07 | |
Well Total Depth: 3303.00 m | |
Surface Hole Latitude: 54.227061 | |
Surface Hole Longitude: -116.512468 |
Date | Event |
---|---|
2018-07-13 | Obtained License |
2018-08-01 | Surface Casing Operation Performed |
2018-08-03 | Direction Drilling Operation Performed - Deviate |
2018-08-04 | Direction Drilling Operation Performed - Horizontal |
2018-08-07 | Finished Drilling |
2018-08-07 | Well Log Performed |
2018-08-07 | Well Mode changed to Drilled and Cased |
2018-08-08 | Production Casing Operation Performed |
2018-08-09 | Rig Released |
2018-08-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-09-12 | Well Began Production |
2018-09-12 | Well Fluid changed to Crude Oil |
2018-09-12 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-07-30 | Trinidad Drilling Ltd. | 22 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-08-03 | 1224.80 | Deviate (5 - 79 degrees) |
2018-08-04 | 1822.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-08-22 | Multi-Stage Fracture | 3279.00 | 3279.10 | 0 |
2018-08-22 | Multi-Stage Fracture | 2800.70 | 2800.80 | 0 |
2018-08-22 | Multi-Stage Fracture | 2745.80 | 2745.90 | 0 |
2018-08-22 | Multi-Stage Fracture | 2691.00 | 2691.10 | 0 |
2018-08-22 | Multi-Stage Fracture | 2649.60 | 2649.70 | 0 |
2018-08-22 | Multi-Stage Fracture | 2594.80 | 2594.90 | 0 |
2018-08-22 | Multi-Stage Fracture | 2540.10 | 2540.20 | 0 |
2018-08-22 | Multi-Stage Fracture | 2498.70 | 2498.80 | 0 |
2018-08-22 | Multi-Stage Fracture | 2443.90 | 2444.00 | 0 |
2018-08-22 | Multi-Stage Fracture | 2389.50 | 2389.60 | 0 |
2018-08-22 | Multi-Stage Fracture | 2335.20 | 2335.30 | 0 |
2018-08-22 | Multi-Stage Fracture | 3237.70 | 3237.80 | 0 |
2018-08-22 | Multi-Stage Fracture | 2280.40 | 2280.50 | 0 |
2018-08-22 | Multi-Stage Fracture | 2239.10 | 2239.20 | 0 |
2018-08-22 | Multi-Stage Fracture | 2184.50 | 2184.60 | 0 |
2018-08-22 | Multi-Stage Fracture | 2130.00 | 2130.10 | 0 |
2018-08-22 | Multi-Stage Fracture | 2048.80 | 2048.90 | 0 |
2018-08-22 | Multi-Stage Fracture | 2007.40 | 2007.50 | 0 |
2018-08-22 | Multi-Stage Fracture | 3169.60 | 3169.70 | 0 |
2018-08-22 | Multi-Stage Fracture | 3115.50 | 3115.60 | 0 |
2018-08-22 | Multi-Stage Fracture | 3060.60 | 3060.70 | 0 |
2018-08-22 | Multi-Stage Fracture | 3006.10 | 3006.20 | 0 |
2018-08-22 | Multi-Stage Fracture | 2937.90 | 2938.00 | 0 |
2018-08-22 | Multi-Stage Fracture | 2883.60 | 2883.70 | 0 |
2018-08-22 | Multi-Stage Fracture | 2842.10 | 2842.20 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-08-22 | 2018-08-22 | 1,643 | 3,358 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen | Not Available | 100 | 12.6131 | N/A | |||
Water | 7732-18-5 | 100 | 73.6762 | N/A | ||||
30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 13.7197 | N/A | ||
30/50 Prime Plus | Step Energy Services | Quartz (SiO2) | 14808-60-7 | 100 | 1.8196 | N/A | ||
SRA-1W (Resin Activator) | Step Energy Services | Activator | Alcohols. C12-14-Secondary. Ethoxylated | 84133-50-6 | 100 | 0.0181 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0181 | N/A | ||||
Polyethylene Glycol | 25322-68-3 | 100 | 0.0181 | N/A | ||||
Secure BIO-10B (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0073 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0073 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0073 | N/A | ||||
SCS-1 (Clay Control) | Step Energy Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.1203 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.1203 | N/A | ||||
SFR-102s (Friction Reducer) | STEP Energy Services | Friction Reducer | Distillates. Petroleum. Hydrotreated Light | 64742-47-8 | 100 | 0.0394 | N/A | |
Proprietary | Trade Secret | 100 | 0.0394 | N/A | ||||
SNE-8 (Non-Emulsifier) | Step Energy Services | Surfactant | Alkyl Aryl Sulfonic Acid | Not Available | 100 | 0.0783 | N/A | |
Alkyl Sulfate | Not Available | 100 | 0.0783 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0783 | N/A | ||||
Polyalkylhydroxyl Alcohol | Not Available | 100 | 0.0783 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-08-09 | 2018-08-10 | Groundwater - Non-saline less than or equal to 150m deep | 500 |
2018-08-09 | 2018-08-22 | Groundwater - Non-saline less than or equal to 150m deep | 2690 |
2018-08-18 | 2018-08-20 | Groundwater - Non-saline less than or equal to 150m deep | 900 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 2792 | 0.0 | 0.0 | 0.0 |
2019 | 8640 | 0.0 | 0.0 | 0.0 |
2020 | 2152 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-08-09 | No Incident Encountered | 0.00 | 0.00 |
2018-08-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]