If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0605172902000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.226979,"lon":-116.512693,"icon":""}]} |
Location: 00/02-29-060-17W5/0 | |
Location Alias: 00/02-29-60-17 W5M | |
Location Alias 2: 00/02-29-060-17 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 5 | |
Range: 17 | |
Section: 29 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TANGLE CREEK CHICKDEE 2-29-60-17 | |
Operator Name: Tangle Creek Energy Ltd. | |
License Number: 0446947 | |
License Date: 2012-06-28 | |
License Status: Issued | |
Spud Date: 2012-08-10 | |
Final Drill Date: 2012-08-18 | |
Well Total Depth: 3195.00 m | |
Surface Hole Latitude: 54.226979 | |
Surface Hole Longitude: -116.512693 |
Date | Event |
---|---|
2012-06-28 | Obtained License |
2012-08-11 | Surface Casing Operation Performed |
2012-08-13 | Direction Drilling Operation Performed - Deviate |
2012-08-15 | Direction Drilling Operation Performed - Horizontal |
2012-08-18 | Finished Drilling |
2012-08-18 | Well Mode changed to Drilled and Cased |
2012-08-21 | Production Casing Operation Performed |
2012-08-22 | Rig Released |
2012-08-30 | Well Log Performed |
2012-08-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-31 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-01 | Well Began Production |
2012-09-01 | Well Fluid changed to Crude Oil |
2012-09-01 | Well Mode changed to Flowing |
2012-09-04 | Well Log Performed |
2012-10-01 | Well Fluid changed to Crude Oil |
2012-10-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-08-10 | Trinidad Drilling Ltd. | 68 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-13 | 1285.80 | Deviate (5 - 79 degrees) |
2012-08-15 | 1788.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-31 | Open Hole/Barefoot Completion | 3194.00 | 3195.00 | 0 |
2012-08-31 | Multi-Stage Fracture | 2578.40 | 2578.50 | 0 |
2012-08-31 | Multi-Stage Fracture | 2506.20 | 2506.30 | 0 |
2012-08-31 | Multi-Stage Fracture | 2432.90 | 2433.00 | 0 |
2012-08-31 | Multi-Stage Fracture | 2360.70 | 2360.80 | 0 |
2012-08-31 | Multi-Stage Fracture | 2277.30 | 2277.40 | 0 |
2012-08-31 | Multi-Stage Fracture | 2204.80 | 2204.90 | 0 |
2012-08-31 | Multi-Stage Fracture | 2131.80 | 2131.90 | 0 |
2012-08-31 | Multi-Stage Fracture | 2060.00 | 2060.10 | 0 |
2012-08-31 | Multi-Stage Fracture | 1987.60 | 1987.70 | 0 |
2012-08-31 | Multi-Stage Fracture | 1914.70 | 1914.80 | 0 |
2012-08-31 | Multi-Stage Fracture | 3162.60 | 3162.70 | 0 |
2012-08-31 | Multi-Stage Fracture | 3084.10 | 3084.20 | 0 |
2012-08-31 | Multi-Stage Fracture | 3011.50 | 3011.60 | 0 |
2012-08-31 | Multi-Stage Fracture | 2939.40 | 2939.50 | 0 |
2012-08-31 | Multi-Stage Fracture | 2868.10 | 2868.20 | 0 |
2012-08-31 | Multi-Stage Fracture | 2796.40 | 2796.50 | 0 |
2012-08-31 | Multi-Stage Fracture | 2724.30 | 2724.40 | 0 |
2012-08-31 | Multi-Stage Fracture | 2651.80 | 2651.90 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2488 | 0.0 | 0.0 | 0.0 |
2013 | 8753 | 0.0 | 0.0 | 0.0 |
2014 | 6375 | 0.0 | 0.0 | 0.0 |
2015 | 8652 | 0.0 | 0.0 | 0.0 |
2016 | 8460 | 0.0 | 0.0 | 0.0 |
2017 | 6984 | 0.0 | 0.0 | 0.0 |
2018 | 8166 | 0.0 | 0.0 | 0.0 |
2019 | 8644 | 0.0 | 0.0 | 0.0 |
2020 | 1431 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-10 | No Incident Encountered | 0.00 | 0.00 |
2012-08-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]