X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605182205000

Well Details

Well ID: 0605182205000
Loading map...
Location: 00/05-22-060-18W5/0
Location Alias: 00/05-22-60-18 W5M
Location Alias 2: 00/05-22-060-18 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 18
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ KAYBOBS 5-22-60-18
Operator Name: XTO Energy Canada ULC
License Number: 0407680
License Date: 2009-01-12
License Status: Issued
Spud Date: 2009-01-31
Final Drill Date: 2009-02-21
Well Total Depth: 3495.00 m
Surface Hole Latitude: 54.213687
Surface Hole Longitude: -116.615946

For data sources see[1][2]

Well History

Date Event
2009-01-12 Obtained License
2009-02-02 Surface Casing Operation Performed
2009-02-04 Direction Drilling Operation Performed - Horizontal
2009-02-15 Production Casing Operation Performed
2009-02-21 Finished Drilling
2009-02-21 Well Log Performed
2009-02-21 Well Mode changed to Drilled and Cased
2009-02-23 Liner Casing Operation Performed
2009-02-23 Perforation Treatment Performed - Open-Hole Completion
2009-02-24 Rig Released
2009-02-26 Well Log Performed
2009-03-01 Perforation Treatment Performed - Multi-Stage Fracture
2009-03-01 Well Fluid changed to Gas
2009-03-01 Well Mode changed to Testing
2009-03-27 Well Log Performed
2009-04-01 Well Began Production
2009-04-01 Well Fluid changed to Gas
2009-04-01 Well Mode changed to Flowing
2010-08-13 Well Fluid changed to Gas
2010-08-13 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-02-04 1520.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-23 Open Hole/Barefoot Completion 3490.70 3495.00 0
2009-03-01 Multi-Stage Fracture 2607.50 2608.30 0
2009-03-01 Multi-Stage Fracture 2490.50 2491.30 0
2009-03-01 Multi-Stage Fracture 2413.60 2414.40 0
2009-03-01 Multi-Stage Fracture 3480.60 3482.00 0
2009-03-01 Multi-Stage Fracture 3399.50 3400.30 0
2009-03-01 Multi-Stage Fracture 3282.50 3283.30 0
2009-03-01 Multi-Stage Fracture 3165.50 3166.30 0
2009-03-01 Multi-Stage Fracture 3048.50 3049.30 0
2009-03-01 Multi-Stage Fracture 2944.90 2945.70 0
2009-03-01 Multi-Stage Fracture 2828.00 2828.80 0
2009-03-01 Multi-Stage Fracture 2711.10 2711.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 6263 0.0 0.0 0.0
2010 8620 0.0 0.0 0.0
2011 7854 0.0 0.0 0.0
2012 7387 0.0 0.0 0.0
2013 7724 0.0 0.0 0.0
2014 6599 0.0 0.0 0.0
2015 8131 0.0 0.0 0.0
2016 7370 0.0 0.0 0.0
2017 7266 0.0 0.0 0.0
2018 5145 0.0 0.0 0.0
2019 627 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-03-01 No Incident Encountered 0.00 0.00

For data sources see[7]

References