If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0605182809000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.223494,"lon":-116.652918,"icon":""}]} |
Location: 00/09-28-060-18W5/0 | |
Location Alias: 00/09-28-60-18 W5M | |
Location Alias 2: 00/09-28-060-18 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 5 | |
Range: 18 | |
Section: 28 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TANGLE CREEK KAYBOBS 9-28-60-18 | |
Operator Name: Tangle Creek Energy Ltd. | |
License Number: 0449611 | |
License Date: 2012-10-30 | |
License Status: Issued | |
Spud Date: 2012-11-05 | |
Final Drill Date: 2012-11-13 | |
Well Total Depth: 3337.00 m | |
Surface Hole Latitude: 54.223494 | |
Surface Hole Longitude: -116.652918 |
Date | Event |
---|---|
2012-10-30 | Obtained License |
2012-11-06 | Surface Casing Operation Performed |
2012-11-09 | Direction Drilling Operation Performed - Deviate |
2012-11-10 | Direction Drilling Operation Performed - Horizontal |
2012-11-13 | Finished Drilling |
2012-11-13 | Well Mode changed to Drilled and Cased |
2012-11-15 | Production Casing Operation Performed |
2012-11-16 | Rig Released |
2012-11-26 | Well Log Performed |
2012-11-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-29 | Perforation Treatment Performed - Open-Hole Completion |
2012-12-01 | Well Began Production |
2012-12-01 | Well Fluid changed to Crude Oil |
2012-12-01 | Well Mode changed to Flowing |
2013-01-01 | Well Fluid changed to Crude Oil |
2013-01-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-11-05 | Trinidad Drilling Ltd. | 22 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-11-09 | 1410.50 | Deviate (5 - 79 degrees) |
2012-11-10 | 1841.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-11-29 | Open Hole/Barefoot Completion | 3332.00 | 3337.00 | 0 |
2012-11-29 | Multi-Stage Fracture | 2718.00 | 2718.10 | 0 |
2012-11-29 | Multi-Stage Fracture | 2645.60 | 2645.70 | 0 |
2012-11-29 | Multi-Stage Fracture | 2572.60 | 2572.70 | 0 |
2012-11-29 | Multi-Stage Fracture | 2499.70 | 2499.80 | 0 |
2012-11-29 | Multi-Stage Fracture | 2427.20 | 2427.30 | 0 |
2012-11-29 | Multi-Stage Fracture | 2354.00 | 2354.10 | 0 |
2012-11-29 | Multi-Stage Fracture | 2280.70 | 2280.80 | 0 |
2012-11-29 | Multi-Stage Fracture | 2207.70 | 2207.80 | 0 |
2012-11-29 | Multi-Stage Fracture | 2134.80 | 2134.90 | 0 |
2012-11-29 | Multi-Stage Fracture | 2062.70 | 2062.80 | 0 |
2012-11-29 | Multi-Stage Fracture | 3330.30 | 3330.40 | 0 |
2012-11-29 | Multi-Stage Fracture | 3225.80 | 3228.90 | 0 |
2012-11-29 | Multi-Stage Fracture | 3153.40 | 3153.50 | 0 |
2012-11-29 | Multi-Stage Fracture | 3080.80 | 3080.90 | 0 |
2012-11-29 | Multi-Stage Fracture | 3008.60 | 3008.70 | 0 |
2012-11-29 | Multi-Stage Fracture | 2936.70 | 2936.80 | 0 |
2012-11-29 | Multi-Stage Fracture | 2874.60 | 2874.70 | 0 |
2012-11-29 | Multi-Stage Fracture | 2790.50 | 2790.60 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 206 | 0.0 | 0.0 | 0.0 |
2013 | 8479 | 0.0 | 0.0 | 0.0 |
2014 | 8357 | 0.0 | 0.0 | 0.0 |
2015 | 7726 | 0.0 | 0.0 | 0.0 |
2016 | 8438 | 0.0 | 0.0 | 0.0 |
2017 | 8711 | 0.0 | 0.0 | 0.0 |
2018 | 8508 | 0.0 | 0.0 | 0.0 |
2019 | 8639 | 0.0 | 0.0 | 0.0 |
2020 | 2157 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-11-05 | No Incident Encountered | 0.00 | 0.00 |
2012-11-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]