If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0605182816020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.223475,"lon":-116.652306,"icon":""}]} |
Location: 02/16-28-060-18W5/0 | |
Location Alias: 02/16-28-60-18 W5M | |
Location Alias 2: 02/16-28-060-18 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 5 | |
Range: 18 | |
Section: 28 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TANGLE CREEK KAYBOBS 16-28-60-18 | |
Operator Name: Tangle Creek Energy Ltd. | |
License Number: 0444806 | |
License Date: 2012-03-09 | |
License Status: Issued | |
Spud Date: 2012-08-25 | |
Final Drill Date: 2012-09-03 | |
Well Total Depth: 3172.00 m | |
Surface Hole Latitude: 54.223475 | |
Surface Hole Longitude: -116.652306 |
Date | Event |
---|---|
2012-03-09 | Obtained License |
2012-08-26 | Surface Casing Operation Performed |
2012-08-28 | Direction Drilling Operation Performed - Deviate |
2012-08-30 | Direction Drilling Operation Performed - Horizontal |
2012-09-03 | Finished Drilling |
2012-09-03 | Well Mode changed to Drilled and Cased |
2012-09-05 | Production Casing Operation Performed |
2012-09-06 | Rig Released |
2012-09-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-13 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-14 | Well Began Production |
2012-09-14 | Well Fluid changed to Crude Oil |
2012-09-14 | Well Mode changed to Flowing |
2012-09-18 | Well Log Performed |
2012-10-14 | Well Fluid changed to Crude Oil |
2012-10-14 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-08-25 | Trinidad Drilling Ltd. | 68 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-28 | 1458.50 | Deviate (5 - 79 degrees) |
2012-08-30 | 1776.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-13 | Open Hole/Barefoot Completion | 3171.00 | 3172.00 | 0 |
2012-09-13 | Multi-Stage Fracture | 2539.00 | 2539.10 | 0 |
2012-09-13 | Multi-Stage Fracture | 2466.00 | 2466.10 | 0 |
2012-09-13 | Multi-Stage Fracture | 2404.20 | 2404.30 | 0 |
2012-09-13 | Multi-Stage Fracture | 2331.20 | 2331.30 | 0 |
2012-09-13 | Multi-Stage Fracture | 2258.80 | 2258.90 | 0 |
2012-09-13 | Multi-Stage Fracture | 2186.00 | 2186.10 | 0 |
2012-09-13 | Multi-Stage Fracture | 2113.30 | 2113.40 | 0 |
2012-09-13 | Multi-Stage Fracture | 2041.60 | 2041.70 | 0 |
2012-09-13 | Multi-Stage Fracture | 1969.40 | 1969.50 | 0 |
2012-09-13 | Multi-Stage Fracture | 1908.80 | 1908.90 | 0 |
2012-09-13 | Multi-Stage Fracture | 3139.10 | 3139.20 | 0 |
2012-09-13 | Multi-Stage Fracture | 3048.20 | 3048.30 | 0 |
2012-09-13 | Multi-Stage Fracture | 2975.40 | 2975.50 | 0 |
2012-09-13 | Multi-Stage Fracture | 2902.50 | 2902.60 | 0 |
2012-09-13 | Multi-Stage Fracture | 2829.20 | 2829.30 | 0 |
2012-09-13 | Multi-Stage Fracture | 2756.40 | 2756.50 | 0 |
2012-09-13 | Multi-Stage Fracture | 2684.00 | 2684.10 | 0 |
2012-09-13 | Multi-Stage Fracture | 2611.70 | 2611.80 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2102 | 0.0 | 0.0 | 0.0 |
2013 | 8530 | 0.0 | 0.0 | 0.0 |
2014 | 8358 | 0.0 | 0.0 | 0.0 |
2015 | 7936 | 0.0 | 0.0 | 0.0 |
2016 | 8638 | 0.0 | 0.0 | 0.0 |
2017 | 8666 | 0.0 | 0.0 | 0.0 |
2018 | 8516 | 0.0 | 0.0 | 0.0 |
2019 | 8451 | 0.0 | 0.0 | 0.0 |
2020 | 2109 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-25 | No Incident Encountered | 0.00 | 0.00 |
2012-09-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]