If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0605183301000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.240245,"lon":-116.635058,"icon":""}]} |
Location: 00/01-33-060-18W5/0 | |
Location Alias: 00/01-33-60-18 W5M | |
Location Alias 2: 00/01-33-060-18 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 5 | |
Range: 18 | |
Section: 33 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TANGLE CREEK KAYBOBS 1-33-60-18 | |
Operator Name: Tangle Creek Energy Ltd. | |
License Number: 0447131 | |
License Date: 2012-07-12 | |
License Status: Issued | |
Spud Date: 2012-08-23 | |
Final Drill Date: 2012-09-05 | |
Well Total Depth: 3370.00 m | |
Surface Hole Latitude: 54.240245 | |
Surface Hole Longitude: -116.635058 |
Date | Event |
---|---|
2012-07-12 | Obtained License |
2012-08-24 | Surface Casing Operation Performed |
2012-08-27 | Direction Drilling Operation Performed - Deviate |
2012-08-29 | Direction Drilling Operation Performed - Horizontal |
2012-09-05 | Finished Drilling |
2012-09-05 | Well Log Performed |
2012-09-05 | Well Mode changed to Drilled and Cased |
2012-09-08 | Intermediate Casing Operation Performed |
2012-09-08 | Liner Casing Operation Performed |
2012-09-09 | Rig Released |
2012-09-15 | Well Log Performed |
2012-09-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-18 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-20 | Well Began Production |
2012-09-20 | Well Fluid changed to Crude Oil |
2012-09-20 | Well Mode changed to Flowing |
2012-09-30 | Well Fluid changed to Crude Oil |
2012-09-30 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-08-23 | Ensign Drilling Inc. | 116 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-27 | 1333.20 | Deviate (5 - 79 degrees) |
2012-08-29 | 1770.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-18 | Open Hole/Barefoot Completion | 3365.00 | 3370.00 | 0 |
2012-09-18 | Multi-Stage Fracture | 2882.80 | 2882.90 | 0 |
2012-09-18 | Multi-Stage Fracture | 2821.80 | 2821.90 | 0 |
2012-09-18 | Multi-Stage Fracture | 2763.00 | 2763.10 | 0 |
2012-09-18 | Multi-Stage Fracture | 2702.70 | 2702.80 | 0 |
2012-09-18 | Multi-Stage Fracture | 2641.50 | 2641.60 | 0 |
2012-09-18 | Multi-Stage Fracture | 2582.70 | 2582.80 | 0 |
2012-09-18 | Multi-Stage Fracture | 2524.20 | 2524.30 | 0 |
2012-09-18 | Multi-Stage Fracture | 2466.20 | 2466.30 | 0 |
2012-09-18 | Multi-Stage Fracture | 2395.20 | 2395.30 | 0 |
2012-09-18 | Multi-Stage Fracture | 2337.60 | 2337.70 | 0 |
2012-09-18 | Multi-Stage Fracture | 3353.40 | 3353.50 | 0 |
2012-09-18 | Multi-Stage Fracture | 2277.10 | 2277.20 | 0 |
2012-09-18 | Multi-Stage Fracture | 2216.80 | 2216.90 | 0 |
2012-09-18 | Multi-Stage Fracture | 2157.60 | 2157.70 | 0 |
2012-09-18 | Multi-Stage Fracture | 2100.10 | 2100.20 | 0 |
2012-09-18 | Multi-Stage Fracture | 2043.40 | 2043.50 | 0 |
2012-09-18 | Multi-Stage Fracture | 1986.50 | 1986.60 | 0 |
2012-09-18 | Multi-Stage Fracture | 1930.30 | 1930.40 | 0 |
2012-09-18 | Multi-Stage Fracture | 3293.00 | 3293.10 | 0 |
2012-09-18 | Multi-Stage Fracture | 3235.30 | 3235.40 | 0 |
2012-09-18 | Multi-Stage Fracture | 3175.10 | 3175.20 | 0 |
2012-09-18 | Multi-Stage Fracture | 3115.30 | 3115.40 | 0 |
2012-09-18 | Multi-Stage Fracture | 3060.80 | 3060.90 | 0 |
2012-09-18 | Multi-Stage Fracture | 3000.80 | 3000.90 | 0 |
2012-09-18 | Multi-Stage Fracture | 2940.90 | 2941.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1955 | 0.0 | 0.0 | 0.0 |
2013 | 8717 | 0.0 | 0.0 | 0.0 |
2014 | 8755 | 0.0 | 0.0 | 0.0 |
2015 | 7552 | 0.0 | 0.0 | 0.0 |
2016 | 8230 | 0.0 | 0.0 | 0.0 |
2017 | 8698 | 0.0 | 0.0 | 0.0 |
2018 | 8339 | 0.0 | 0.0 | 0.0 |
2019 | 8437 | 0.0 | 0.0 | 0.0 |
2020 | 1955 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-11 | No Incident Encountered | 0.00 | 0.00 |
2012-09-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]