If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0605190904000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.178267,"lon":-116.79536,"icon":""}]} |
| Location: 00/04-09-060-19W5/0 | |
| Location Alias: 00/04-09-60-19 W5M | |
| Location Alias 2: 00/04-09-060-19 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 060 | |
| Meridian: 5 | |
| Range: 19 | |
| Section: 09 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TANGLE CREEK HZ KAYBOBS 4-9-60-19 | |
| Operator Name: Tangle Creek Energy Ltd. | |
| License Number: 0398498 | |
| License Date: 2008-07-14 | |
| License Status: Suspension | |
| Spud Date: 2008-07-29 | |
| Final Drill Date: 2008-08-18 | |
| Well Total Depth: 3161.00 m | |
| Surface Hole Latitude: 54.178267 | |
| Surface Hole Longitude: -116.795360 |
| Date | Event |
|---|---|
| 2008-07-14 | Obtained License |
| 2008-08-01 | Surface Casing Operation Performed |
| 2008-08-02 | Direction Drilling Operation Performed - Horizontal |
| 2008-08-13 | Intermediate Casing Operation Performed |
| 2008-08-18 | Finished Drilling |
| 2008-08-18 | Well Mode changed to Drilled and Cased |
| 2008-08-20 | Liner Casing Operation Performed |
| 2008-08-21 | Rig Released |
| 2008-09-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2008-09-17 | Perforation Treatment Performed - Open-Hole Completion |
| 2008-09-17 | Well Log Performed |
| 2008-09-24 | Well Began Production |
| 2008-09-24 | Well Fluid changed to Gas |
| 2008-09-24 | Well Mode changed to Flowing |
| 2011-03-01 | Well Fluid changed to Gas |
| 2011-03-01 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2008-08-02 | 400.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2008-09-17 | Open Hole/Barefoot Completion | 3154.50 | 3161.00 | 0 |
| 2008-09-17 | Multi-Stage Fracture | 3110.60 | 3110.70 | 0 |
| 2008-09-17 | Multi-Stage Fracture | 3022.70 | 3022.80 | 0 |
| 2008-09-17 | Multi-Stage Fracture | 2912.60 | 2912.70 | 0 |
| 2008-09-17 | Multi-Stage Fracture | 2793.00 | 2793.10 | 0 |
| 2008-09-17 | Multi-Stage Fracture | 2691.50 | 2691.60 | 0 |
| 2008-09-17 | Multi-Stage Fracture | 2571.00 | 2571.10 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2008 | 631 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2008-09-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]