If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0605191107002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.180882,"lon":-116.745903,"icon":""}]} |
Location: 00/07-11-060-19W5/2 | |
Location Alias: 00/07-11-60-19 W5M | |
Location Alias 2: 00/07-11-060-19 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 5 | |
Range: 19 | |
Section: 11 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TANGLE CREEK HZ KAYBOBS 11-11-60-19 | |
Operator Name: Tangle Creek Energy Ltd. | |
License Number: 0405932 | |
License Date: 2008-12-11 | |
License Status: Amended | |
Spud Date: 2009-01-06 | |
Final Drill Date: 2009-02-15 | |
Well Total Depth: 3416.00 m | |
Surface Hole Latitude: 54.180882 | |
Surface Hole Longitude: -116.745903 |
Date | Event |
---|---|
2008-12-11 | Obtained License |
2009-01-08 | Surface Casing Operation Performed |
2009-01-13 | Direction Drilling Operation Performed - Horizontal |
2009-01-26 | Direction Drilling Operation Performed - Horizontal |
2009-02-10 | Intermediate Casing Operation Performed |
2009-02-15 | Finished Drilling |
2009-02-15 | Well Log Performed |
2009-02-15 | Well Mode changed to Drilled and Cased |
2009-02-18 | Liner Casing Operation Performed |
2009-02-19 | Rig Released |
2009-03-19 | Well Log Performed |
2009-03-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2009-03-20 | Perforation Treatment Performed - Open-Hole Completion |
2009-04-18 | Well Began Production |
2009-04-18 | Well Fluid changed to Gas |
2009-04-18 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-01-13 | 1650.00 | Horizontal |
2009-01-26 | 1928.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-03-20 | Open Hole/Barefoot Completion | 3391.00 | 3416.00 | 0 |
2009-03-20 | Multi-Stage Fracture | 3350.80 | 3350.90 | 0 |
2009-03-20 | Multi-Stage Fracture | 3234.60 | 3234.70 | 0 |
2009-03-20 | Multi-Stage Fracture | 3115.50 | 3115.60 | 0 |
2009-03-20 | Multi-Stage Fracture | 2998.60 | 2998.70 | 0 |
2009-03-20 | Multi-Stage Fracture | 2893.40 | 2893.50 | 0 |
2009-03-20 | Multi-Stage Fracture | 2775.30 | 2775.40 | 0 |
2009-03-20 | Multi-Stage Fracture | 2670.40 | 2670.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 5256 | 0.0 | 0.0 | 0.0 |
2010 | 8109 | 0.0 | 0.0 | 0.0 |
2011 | 6739 | 0.0 | 0.0 | 0.0 |
2012 | 7742 | 0.0 | 0.0 | 0.0 |
2013 | 6768 | 0.0 | 0.0 | 0.0 |
2014 | 7530 | 0.0 | 0.0 | 0.0 |
2015 | 668 | 0.0 | 0.0 | 0.0 |
2016 | 4758 | 0.0 | 0.0 | 0.0 |
2017 | 7585 | 0.0 | 0.0 | 0.0 |
2018 | 8465 | 0.0 | 0.0 | 0.0 |
2019 | 7440 | 0.0 | 0.0 | 0.0 |
2020 | 1656 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2009-03-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]