X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605191504000

Well Details

Well ID: 0605191504000
Loading map...
Location: 00/04-15-060-19W5/0
Location Alias: 00/04-15-60-19 W5M
Location Alias 2: 00/04-15-060-19 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 19
Section: 15
County/Municipality: Municipal District of Greenview No. 16
Well Name: TANGLE CREEK HZ KAYBOBS 4-15-60-19
Operator Name: Tangle Creek Energy Ltd.
License Number: 0412224
License Date: 2009-09-10
License Status: Issued
Spud Date: 2009-09-23
Final Drill Date: 2009-10-23
Well Total Depth: 3764.00 m
Surface Hole Latitude: 54.195320
Surface Hole Longitude: -116.761514

For data sources see[1][2]

Well History

Date Event
2009-09-10 Obtained License
2009-09-24 Lost Circulation Occurred
2009-09-26 Surface Casing Operation Performed
2009-09-27 Well Log Performed
2009-10-05 Direction Drilling Operation Performed - Horizontal
2009-10-18 Intermediate Casing Operation Performed
2009-10-23 Finished Drilling
2009-10-23 Well Mode changed to Drilled and Cased
2009-10-25 Liner Casing Operation Performed
2009-10-26 Rig Released
2009-11-04 Well Log Performed
2009-11-06 Perforation Treatment Performed - Multi-Stage Fracture
2009-11-06 Perforation Treatment Performed - Open-Hole Completion
2009-11-21 Well Began Production
2009-11-21 Well Fluid changed to Gas
2009-11-21 Well Mode changed to Flowing
2014-02-21 Well Fluid changed to Gas
2014-02-21 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-10-05 2093.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-11-06 Open Hole/Barefoot Completion 3759.00 3764.00 0
2009-11-06 Multi-Stage Fracture 2688.20 2688.30 0
2009-11-06 Multi-Stage Fracture 2574.90 2575.00 0
2009-11-06 Multi-Stage Fracture 2448.10 2448.20 0
2009-11-06 Multi-Stage Fracture 3750.00 3750.10 0
2009-11-06 Multi-Stage Fracture 3615.80 3615.90 0
2009-11-06 Multi-Stage Fracture 3488.70 3488.80 0
2009-11-06 Multi-Stage Fracture 3374.90 3375.00 0
2009-11-06 Multi-Stage Fracture 3247.80 3247.90 0
2009-11-06 Multi-Stage Fracture 3134.60 3134.70 0
2009-11-06 Multi-Stage Fracture 3008.60 3008.70 0
2009-11-06 Multi-Stage Fracture 2787.70 2787.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 897 0.0 0.0 0.0
2010 8400 0.0 0.0 0.0
2011 7122 0.0 0.0 0.0
2012 8570 0.0 0.0 0.0
2013 7886 0.0 0.0 0.0
2014 8093 0.0 0.0 0.0
2015 1924 0.0 0.0 0.0
2016 6730 0.0 0.0 0.0
2017 8108 0.0 0.0 0.0
2018 8283 0.0 0.0 0.0
2019 8616 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-09-24 Lost Circulation 103.00 482.00
2009-11-06 No Incident Encountered 0.00 0.00

For data sources see[7]

References