X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605192507000

Well Details

Well ID: 0605192507000
Loading map...
Location: 00/07-25-060-19W5/0
Location Alias: 00/07-25-60-19 W5M
Location Alias 2: 00/07-25-060-19 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 19
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE KAYBOBS 7-25-60-19
Operator Name: Cequence Energy Ltd.
License Number: 0039651
License Date: 1971-02-01
License Status: Issued
Spud Date: 1971-02-09
Final Drill Date: 1971-03-13
Well Total Depth: 3371.10 m
Surface Hole Latitude: 54.217067
Surface Hole Longitude: -116.710701

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-02-01 Obtained License
1971-02-22 Drill Stem Test Performed
1971-03-13 Finished Drilling
1971-03-15 Production Casing Operation Performed
1971-12-11 Perforation Treatment Performed - Jet Perforation
1971-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-05-05 Well Mode changed to Drilled and Cased
1973-03-06 Well Log Performed
1990-12-14 Well Fluid changed to Gas
1990-12-14 Well Mode changed to Testing
1990-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-12-15 Plug Back Performed
1990-12-15 Well Fluid changed to Gas
1990-12-15 Well Mode changed to Abandoned Zone
1990-12-16 Well Log Performed
1990-12-19 Perforation Treatment Performed - Jet Perforation
1990-12-19 Well Log Performed
1990-12-20 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-12-11 Perforation 3329.00 3333.30 7
1971-12-13 Acid Treatment 3329.00 3333.30 0
1971-12-13 Acid Treatment 3329.00 3333.30 0
1990-12-15 Packing Device Capped w/Cement 3280.00 3296.00 0
1990-12-15 Packing Device Capped w/Cement 2200.00 2208.00 0
1990-12-19 Perforation 2153.70 2162.30 16
1990-12-20 Fracture 2153.70 2162.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 125 0.0 0.0 0.0

For data sources see[5]

References