X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605192603000

Well Details

Well ID: 0605192603000
Loading map...
Location: 00/03-26-060-19W5/0
Location Alias: 00/03-26-60-19 W5M
Location Alias 2: 00/03-26-060-19 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 19
Section: 26
County/Municipality: Municipal District of Greenview No. 16
Well Name: AMOCO KAYBOBS 3-26-60-19
Operator Name: XTO Energy Canada ULC
License Number: 0036273
License Date: 1969-05-29
License Status: Abandoned
Spud Date: 1969-06-08
Final Drill Date: 1969-07-11
Well Total Depth: 3416.80 m
Surface Hole Latitude: 54.212477
Surface Hole Longitude: -116.739006

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-05-29 Obtained License
1969-06-20 Drill Stem Test Performed
1969-07-11 Finished Drilling
1969-07-11 Well Mode changed to Drilled and Cased
1969-07-14 Production Casing Operation Performed
1969-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-07-27 Perforation Treatment Performed - Jet Perforation
1970-01-27 Well Began Production
1970-01-27 Well Fluid changed to Gas
1970-01-27 Well Mode changed to Flowing
1971-08-27 Perforation Treatment Performed - Jet Perforation
1971-08-28 Perforation Treatment Performed - Acid Wash - No Pressure
1971-08-28 Perforation Treatment Performed - Cement Squeeze
1985-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-05-09 Well Log Performed
1988-01-20 Well Log Performed
1988-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-06-05 Perforation Treatment Performed - Jet Perforation
2003-06-05 Perforation Treatment Performed - Remedial Casing
2003-06-05 Well Log Performed
2003-06-13 Perforation Treatment Performed - Cement Plug
2003-06-13 Plug Back Performed
2003-06-13 Well Fluid changed to Gas
2003-06-13 Well Log Performed
2003-06-13 Well Mode changed to Abandoned Zone
2003-06-14 Perforation Treatment Performed - Cement Plug
2003-06-14 Plug Back Performed
2003-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-16 Plug Back Performed
2003-06-17 Perforation Treatment Performed - Jet Perforation
2003-06-18 Perforation Treatment Performed - Cement Plug
2003-06-18 Plug Back Performed
2003-06-20 Perforation Treatment Performed - Jet Perforation
2003-06-21 Perforation Treatment Performed - Cement Plug
2003-06-21 Plug Back Performed
2003-06-22 Perforation Treatment Performed - Cement Plug
2003-06-22 Plug Back Performed
2003-06-23 Perforation Treatment Performed - Jet Perforation
2003-06-24 Perforation Treatment Performed - Cement Plug
2003-06-24 Plug Back Performed
2003-06-25 Perforation Treatment Performed - Jet Perforation
2003-06-26 Perforation Treatment Performed - Cement Plug
2003-06-26 Plug Back Performed
2003-06-27 Perforation Treatment Performed - Jet Perforation
2003-06-28 Perforation Treatment Performed - Cement Plug
2003-06-28 Plug Back Performed
2003-06-29 Perforation Treatment Performed - Cement Plug
2003-06-29 Perforation Treatment Performed - Jet Perforation
2003-06-29 Plug Back Performed
2004-01-11 Well Abandoned
2004-01-11 Well Fluid changed to Gas
2004-01-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-07-27 Perforation 3363.80 3369.00 7
1992-02-18 Acid Treatment 3363.80 3369.00 0
2003-06-05 Perforation 172.00 172.90 99
2003-06-05 Remedial Casing Cementing 172.00 172.90 0
2003-06-13 Cement Plug 2865.00 3368.00 0
2003-06-14 Cement Plug 2779.00 2865.00 0
2003-06-16 Packing Device Capped w/Cement 2720.00 2730.00 0
2003-06-17 Perforation 2467.00 2467.90 99
2003-06-18 Cement Plug 2438.00 2516.00 0
2003-06-20 Perforation 2235.00 2236.00 17
2003-06-20 Perforation 2205.00 2206.00 17
1969-07-27 Acid Treatment 3363.80 3369.00 0
2003-06-21 Cement Plug 2219.00 2262.00 0
2003-06-22 Cement Plug 2168.00 2219.00 0
2003-06-23 Perforation 1979.00 1980.00 17
2003-06-23 Perforation 1965.50 1966.50 17
2003-06-24 Cement Plug 1926.50 2000.00 0
2003-06-25 Perforation 1560.00 1561.00 14
2003-06-25 Perforation 1550.00 1551.00 14
2003-06-26 Cement Plug 1514.80 1577.00 0
2003-06-27 Perforation 920.00 921.00 14
2003-06-28 Cement Plug 876.50 940.00 0
1971-08-27 Perforation 3376.00 3378.40 13
2003-06-29 Perforation 482.00 483.00 14
2003-06-29 Perforation 467.00 468.00 14
2003-06-29 Cement Plug 394.00 483.00 0
1971-08-28 Acid Wash 3376.00 3378.40 0
1971-08-28 Cement Squeeze 3376.00 3378.40 0
1985-03-28 Acid Treatment 3363.80 3369.00 0
1986-01-09 Acid Treatment 3363.80 3369.00 0
1987-05-08 Acid Treatment 3363.80 3369.00 0
1988-02-02 Acid Treatment 3363.80 3369.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 129 0.0 0.0 0.0
1970 2694 0.0 0.0 0.0
1971 1732 0.0 0.0 0.0
1972 8245 0.0 0.0 0.0
1973 4834 0.0 0.0 0.0
1974 7533 0.0 0.0 0.0
1975 8068 0.0 0.0 0.0
1976 7895 0.0 0.0 0.0
1977 8601 0.0 0.0 0.0
1978 6242 0.0 0.0 0.0
1979 8337 0.0 0.0 0.0
1980 8658 0.0 0.0 0.0
1981 8659 0.0 0.0 0.0
1982 8694 0.0 0.0 0.0
1983 8672 0.0 0.0 0.0
1984 8616 0.0 0.0 0.0
1985 7864 0.0 0.0 0.0
1986 8645 0.0 0.0 0.0
1987 7438 0.0 0.0 0.0
1988 7799 0.0 0.0 0.0
1989 7931 0.0 0.0 0.0
1990 8485 0.0 0.0 0.0
1991 7785 0.0 0.0 0.0
1992 7967 0.0 0.0 0.0
1993 7269 0.0 0.0 0.0
1994 8372 0.0 0.0 0.0
1995 8303 0.0 0.0 0.0
1996 7959 0.0 0.0 0.0
1997 7957 0.0 0.0 0.0
1998 8575 0.0 0.0 0.0
1999 8638 0.0 0.0 0.0
2000 8640 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 4343 0.0 0.0 0.0

For data sources see[5]

References