If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0605201601020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.197094,"lon":-116.928054,"icon":""}]} |
Location: 02/01-16-060-20W5/0 | |
Location Alias: 02/01-16-60-20 W5M | |
Location Alias 2: 02/01-16-060-20 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 5 | |
Range: 20 | |
Section: 16 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TANGLE CREEK KAYBOBS 1-16-60-20 | |
Operator Name: Tangle Creek Energy Ltd. | |
License Number: 0444749 | |
License Date: 2012-03-07 | |
License Status: Amended | |
Spud Date: 2012-07-13 | |
Final Drill Date: 2012-07-25 | |
Well Total Depth: 3324.00 m | |
Surface Hole Latitude: 54.197094 | |
Surface Hole Longitude: -116.928054 |
Date | Event |
---|---|
2012-03-07 | Obtained License |
2012-07-15 | Surface Casing Operation Performed |
2012-07-18 | Direction Drilling Operation Performed - Deviate |
2012-07-19 | Direction Drilling Operation Performed - Horizontal |
2012-07-25 | Finished Drilling |
2012-07-25 | Well Mode changed to Drilled and Cased |
2012-07-27 | Production Casing Operation Performed |
2012-07-28 | Rig Released |
2012-08-12 | Well Log Performed |
2012-08-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-14 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-01 | Well Began Production |
2012-09-01 | Well Fluid changed to Crude Oil |
2012-09-01 | Well Mode changed to Flowing |
2012-10-01 | Well Fluid changed to Crude Oil |
2012-10-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-07-13 | Trinidad Drilling Ltd. | 22 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-07-18 | 1590.70 | Deviate (5 - 79 degrees) |
2012-07-19 | 1906.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-14 | Open Hole/Barefoot Completion | 3307.80 | 3324.00 | 0 |
2012-08-14 | Multi-Stage Fracture | 2567.90 | 2568.00 | 0 |
2012-08-14 | Multi-Stage Fracture | 2497.30 | 2497.40 | 0 |
2012-08-14 | Multi-Stage Fracture | 2423.40 | 2423.50 | 0 |
2012-08-14 | Multi-Stage Fracture | 2351.20 | 2351.30 | 0 |
2012-08-14 | Multi-Stage Fracture | 2289.30 | 2289.40 | 0 |
2012-08-14 | Multi-Stage Fracture | 2217.10 | 2217.20 | 0 |
2012-08-14 | Multi-Stage Fracture | 2144.60 | 2144.70 | 0 |
2012-08-14 | Multi-Stage Fracture | 2072.40 | 2072.50 | 0 |
2012-08-14 | Multi-Stage Fracture | 2000.30 | 2000.40 | 0 |
2012-08-14 | Multi-Stage Fracture | 3271.30 | 3271.40 | 0 |
2012-08-14 | Multi-Stage Fracture | 3185.30 | 3185.40 | 0 |
2012-08-14 | Multi-Stage Fracture | 3113.00 | 3113.10 | 0 |
2012-08-14 | Multi-Stage Fracture | 3030.00 | 3030.10 | 0 |
2012-08-14 | Multi-Stage Fracture | 2880.50 | 2880.60 | 0 |
2012-08-14 | Multi-Stage Fracture | 2796.50 | 2796.60 | 0 |
2012-08-14 | Multi-Stage Fracture | 2714.30 | 2714.40 | 0 |
2012-08-14 | Multi-Stage Fracture | 2640.90 | 2641.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2616 | 0.0 | 0.0 | 0.0 |
2013 | 7572 | 0.0 | 0.0 | 0.0 |
2014 | 8247 | 0.0 | 0.0 | 0.0 |
2015 | 8055 | 0.0 | 0.0 | 0.0 |
2016 | 8518 | 0.0 | 0.0 | 0.0 |
2017 | 8399 | 0.0 | 0.0 | 0.0 |
2018 | 7848 | 0.0 | 0.0 | 0.0 |
2019 | 8279 | 0.0 | 0.0 | 0.0 |
2020 | 1704 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-13 | No Incident Encountered | 0.00 | 0.00 |
2012-08-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]