X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605201801000

Well Details

Well ID: 0605201801000
Loading map...
Location: 00/01-18-060-20W5/0
Location Alias: 00/01-18-60-20 W5M
Location Alias 2: 00/01-18-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN HZ FIR 1-18-60-20
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0435212
License Date: 2011-07-18
License Status: Suspension
Spud Date: 2011-09-10
Final Drill Date: 2011-11-04
Well Total Depth: 4672.00 m
Surface Hole Latitude: 54.192859
Surface Hole Longitude: -116.993583

For data sources see[1][2]

Well History

Date Event
2011-07-18 Obtained License
2011-09-11 Lost Circulation Occurred
2011-09-17 Surface Casing Operation Performed
2011-10-04 Direction Drilling Operation Performed - Horizontal
2011-10-04 Well Log Performed
2011-10-07 Intermediate Casing Operation Performed
2011-11-04 Finished Drilling
2011-11-04 Well Log Performed
2011-11-04 Well Mode changed to Drilled and Cased
2011-11-08 Liner Casing Operation Performed
2011-11-13 Rig Released
2011-12-30 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-03 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-26 Well Began Production
2012-01-26 Well Fluid changed to Shale Gas Only
2012-01-26 Well Mode changed to Flowing
2012-02-24 Well Fluid changed to Shale Gas Only
2012-02-24 Well Mode changed to Pumping
2012-12-20 Well Log Performed
2019-08-01 Well Fluid changed to Shale Gas Only
2019-08-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-04 3141.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-30 Multi-Stage Fracture 4517.00 4637.50 0
2012-01-03 Multi-Stage Fracture 4426.00 4494.00 0
2012-01-03 Multi-Stage Fracture 4312.00 4393.00 0
2012-01-04 Multi-Stage Fracture 4192.00 4273.00 0
2012-01-05 Multi-Stage Fracture 4072.00 4153.00 0
2012-01-05 Multi-Stage Fracture 3952.00 4033.00 0
2012-01-09 Multi-Stage Fracture 3832.00 3913.00 0
2012-01-09 Multi-Stage Fracture 3712.00 3763.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 8134 0.0 0.0 0.0
2013 8030 0.0 0.0 0.0
2014 7681 0.0 0.0 0.0
2015 6672 0.0 0.0 0.0
2016 6660 0.0 0.0 0.0
2017 6890 0.0 0.0 0.0
2018 1133 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-09-11 Lost Circulation 117.00 136.00

For data sources see[7]

References