X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605202201000

Well Details

Well ID: 0605202201000
Loading map...
Location: 00/01-22-060-20W5/0
Location Alias: 00/01-22-60-20 W5M
Location Alias 2: 00/01-22-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: TANGLE CREEK KAYBOBS 1-22-60-20
Operator Name: Tangle Creek Energy Ltd.
License Number: 0447535
License Date: 2012-08-01
License Status: Issued
Spud Date: 2012-10-23
Final Drill Date: 2012-11-04
Well Total Depth: 3300.00 m
Surface Hole Latitude: 54.196979
Surface Hole Longitude: -116.927668

For data sources see[1][2]

Well History

Date Event
2012-08-01 Obtained License
2012-10-26 Surface Casing Operation Performed
2012-10-28 Direction Drilling Operation Performed - Deviate
2012-10-30 Direction Drilling Operation Performed - Horizontal
2012-11-04 Finished Drilling
2012-11-04 Well Mode changed to Drilled and Cased
2012-11-06 Production Casing Operation Performed
2012-11-07 Rig Released
2012-11-11 Well Log Performed
2012-11-15 Well Log Performed
2012-12-13 Well Began Production
2012-12-13 Well Fluid changed to Crude Oil
2012-12-13 Well Mode changed to Flowing
2012-12-20 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-20 Perforation Treatment Performed - Open-Hole Completion
2013-01-13 Well Fluid changed to Crude Oil
2013-01-13 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-10-23 Trinidad Drilling Ltd. 68 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-10-28 1546.70 Deviate (5 - 79 degrees)
2012-10-30 1888.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-12-20 Open Hole/Barefoot Completion 3295.00 3300.00 0
2012-12-20 Multi-Stage Fracture 2672.00 2672.10 0
2012-12-20 Multi-Stage Fracture 2599.30 2599.40 0
2012-12-20 Multi-Stage Fracture 2525.60 2525.70 0
2012-12-20 Multi-Stage Fracture 2451.80 2451.90 0
2012-12-20 Multi-Stage Fracture 2379.60 2379.70 0
2012-12-20 Multi-Stage Fracture 2307.70 2307.80 0
2012-12-20 Multi-Stage Fracture 2234.90 2235.00 0
2012-12-20 Multi-Stage Fracture 2161.50 2161.60 0
2012-12-20 Multi-Stage Fracture 2076.40 2076.50 0
2012-12-20 Multi-Stage Fracture 2002.80 2002.90 0
2012-12-20 Multi-Stage Fracture 3263.10 3263.20 0
2012-12-20 Multi-Stage Fracture 3176.70 3176.80 0
2012-12-20 Multi-Stage Fracture 3104.20 3104.30 0
2012-12-20 Multi-Stage Fracture 3032.20 3032.30 0
2012-12-20 Multi-Stage Fracture 2959.70 2959.80 0
2012-12-20 Multi-Stage Fracture 2887.40 2887.50 0
2012-12-20 Multi-Stage Fracture 2815.20 2815.30 0
2012-12-20 Multi-Stage Fracture 2743.40 2743.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 480 0.0 0.0 0.0
2013 7666 0.0 0.0 0.0
2014 8024 0.0 0.0 0.0
2015 7467 0.0 0.0 0.0
2016 7886 0.0 0.0 0.0
2017 7349 0.0 0.0 0.0
2018 7992 0.0 0.0 0.0
2019 8495 0.0 0.0 0.0
2020 2088 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-23 No Incident Encountered 0.00 0.00
2012-11-12 No Incident Encountered 0.00 0.00

For data sources see[8]

References