X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605203312002

Well Details

Well ID: 0605203312002
Loading map...
Location: 00/12-33-060-20W5/2
Location Alias: 00/12-33-60-20 W5M
Location Alias 2: 00/12-33-060-20 W5/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 33
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ KAYBOBS 10-33-60-20
Operator Name: XTO Energy Canada ULC
License Number: 0401133
License Date: 2008-09-19
License Status: Amended
Spud Date: 2008-12-06
Final Drill Date: 2009-01-04
Well Total Depth: 4048.00 m
Surface Hole Latitude: 54.235568
Surface Hole Longitude: -116.921611

For data sources see[1][2]

Well History

Date Event
2008-09-19 Obtained License
2008-12-07 Surface Casing Operation Performed
2008-12-10 Direction Drilling Operation Performed - Horizontal
2008-12-18 Production Casing Operation Performed
2008-12-25 Direction Drilling Operation Performed - Horizontal
2009-01-04 Finished Drilling
2009-01-04 Well Log Performed
2009-01-04 Well Mode changed to Drilled and Cased
2009-01-05 Well Log Performed
2009-01-07 Liner Casing Operation Performed
2009-01-07 Perforation Treatment Performed - Open-Hole Completion
2009-01-08 Rig Released
2009-01-11 Well Log Performed
2009-01-31 Perforation Treatment Performed - Multi-Stage Fracture
2009-06-02 Well Began Production
2009-06-02 Well Fluid changed to Gas
2009-06-02 Well Mode changed to Flowing
2009-07-26 Well Log Performed
2012-11-02 Well Fluid changed to Gas
2012-11-02 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-12-10 1900.00 Horizontal
2008-12-25 2829.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-01-07 Open Hole/Barefoot Completion 4008.50 4048.00 0
2009-01-31 Multi-Stage Fracture 3999.00 4000.20 0
2009-01-31 Multi-Stage Fracture 3917.20 3917.90 0
2009-01-31 Multi-Stage Fracture 3799.40 3800.10 0
2009-01-31 Multi-Stage Fracture 3639.10 3639.80 0
2009-01-31 Multi-Stage Fracture 3508.90 3509.60 0
2009-01-31 Multi-Stage Fracture 3350.40 3351.20 0
2009-01-31 Multi-Stage Fracture 2820.40 2821.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 4906 0.0 0.0 0.0
2010 8281 0.0 0.0 0.0
2011 8276 0.0 0.0 0.0
2012 8060 0.0 0.0 0.0
2013 7625 0.0 0.0 0.0
2014 6602 0.0 0.0 0.0
2015 8044 0.0 0.0 0.0
2016 5857 0.0 0.0 0.0
2017 7287 0.0 0.0 0.0
2018 5405 0.0 0.0 0.0
2019 3651 0.0 0.0 0.0
2020 2172 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-01-31 No Incident Encountered 0.00 0.00

For data sources see[7]

References