X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605211114000

Well Details

Well ID: 0605211114000
Loading map...
Location: 00/14-11-060-21W5/0
Location Alias: 00/14-11-60-21 W5M
Location Alias 2: 00/14-11-060-21 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 21
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN HZ FIR 14-11-60-21
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0446452
License Date: 2012-06-12
License Status: Issued
Spud Date: 2012-08-25
Final Drill Date: 2012-09-11
Well Total Depth: 3046.00 m
Surface Hole Latitude: 54.166428
Surface Hole Longitude: -117.041064

For data sources see[1][2]

Well History

Date Event
2012-06-12 Obtained License
2012-08-30 Surface Casing Operation Performed
2012-09-01 Well Log Performed
2012-09-02 Direction Drilling Operation Performed - Deviate
2012-09-04 Well Log Performed
2012-09-05 Intermediate Casing Operation Performed
2012-09-06 Direction Drilling Operation Performed - Horizontal
2012-09-11 Finished Drilling
2012-09-11 Perforation Treatment Performed - Open-Hole Completion
2012-09-11 Well Log Performed
2012-09-11 Well Mode changed to Drilled and Cased
2012-09-13 Production Casing Operation Performed
2012-09-14 Rig Released
2012-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-01 Well Began Production
2012-11-01 Well Fluid changed to Crude Oil
2012-11-01 Well Mode changed to Flowing
2012-12-06 Well Fluid changed to Crude Oil
2012-12-06 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-25 Ensign Drilling Inc. 52 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-09-02 1289.00 Deviate (5 - 79 degrees)
2012-09-06 1800.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-11 Open Hole/Barefoot Completion 3030.00 3046.00 0
2012-09-25 Multi-Stage Fracture 2290.30 2290.70 0
2012-09-25 Multi-Stage Fracture 2216.70 2217.10 0
2012-09-25 Multi-Stage Fracture 2059.90 2060.30 0
2012-09-25 Multi-Stage Fracture 1973.10 1973.50 0
2012-09-25 Multi-Stage Fracture 1859.70 1860.10 0
2012-09-25 Multi-Stage Fracture 3011.40 3012.20 0
2012-09-25 Multi-Stage Fracture 2951.00 2951.50 0
2012-09-25 Multi-Stage Fracture 2850.90 2851.40 0
2012-09-25 Multi-Stage Fracture 2764.10 2764.50 0
2012-09-25 Multi-Stage Fracture 2664.10 2664.50 0
2012-09-25 Multi-Stage Fracture 2577.20 2577.60 0
2012-09-25 Multi-Stage Fracture 2477.10 2477.50 0
2012-09-25 Multi-Stage Fracture 2390.30 2390.70 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1464 0.0 0.0 0.0
2013 8324 0.0 0.0 0.0
2014 6786 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 6804 0.0 0.0 0.0
2017 8135 0.0 0.0 0.0
2018 7986 0.0 0.0 0.0
2019 7589 0.0 0.0 0.0
2020 1926 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-14 No Incident Encountered 0.00 0.00
2012-10-05 No Incident Encountered 0.00 0.00

For data sources see[8]

References