If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0605230503000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.167506,"lon":-117.422965,"icon":""}]} |
Location: 00/03-05-060-23W5/0 | |
Location Alias: 00/03-05-60-23 W5M | |
Location Alias 2: 00/03-05-060-23 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 5 | |
Range: 23 | |
Section: 05 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: COGI PLACID 3-5-60-23 | |
Operator Name: DEL Canada GP Ltd. | |
License Number: 0421771 | |
License Date: 2010-07-09 | |
License Status: Issued | |
Spud Date: 2010-08-08 | |
Final Drill Date: 2010-09-02 | |
Well Total Depth: 3212.00 m | |
Surface Hole Latitude: 54.167506 | |
Surface Hole Longitude: -117.422965 |
Date | Event |
---|---|
2010-07-09 | Obtained License |
2010-08-11 | Surface Casing Operation Performed |
2010-08-14 | Direction Drilling Operation Performed - Horizontal |
2010-08-25 | Intermediate Casing Operation Performed |
2010-09-02 | Finished Drilling |
2010-09-02 | Well Mode changed to Drilled and Cased |
2010-09-04 | Liner Casing Operation Performed |
2010-09-04 | Perforation Treatment Performed - Open-Hole Completion |
2010-09-06 | Rig Released |
2010-10-02 | Well Log Performed |
2010-10-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-10-08 | Well Began Production |
2010-10-08 | Well Fluid changed to Crude Oil |
2010-10-08 | Well Mode changed to Flowing |
2016-11-01 | Well Fluid changed to Crude Oil |
2016-11-01 | Well Mode changed to Suspended |
2019-08-01 | Well Fluid changed to Crude Oil |
2019-08-01 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-08-14 | 1532.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-09-04 | Open Hole/Barefoot Completion | 2100.00 | 3212.00 | 0 |
2010-10-06 | Multi-Stage Fracture | 2129.70 | 3182.40 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 1860 | 0.0 | 0.0 | 0.0 |
2011 | 8066 | 0.0 | 0.0 | 0.0 |
2012 | 8286 | 0.0 | 0.0 | 0.0 |
2013 | 7648 | 0.0 | 0.0 | 0.0 |
2014 | 8043 | 0.0 | 0.0 | 0.0 |
2015 | 8288 | 0.0 | 0.0 | 0.0 |
2016 | 1273 | 0.0 | 0.0 | 0.0 |
2019 | 1265 | 0.0 | 0.0 | 0.0 |
2020 | 1710 | 0.0 | 0.0 | 0.0 |
For data sources see[6]