X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605233204020

Well Details

Well ID: 0605233204020
Location: 02/04-32-060-23W5/0
Location Alias: 02/04-32-60-23 W5M
Location Alias 2: 02/04-32-060-23 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 23
Section: 32
County/Municipality: Municipal District of Greenview No. 16
Well Name: ATH 102 HZ PLACID 4-32-60-23
Operator Name: Athabasca Oil Corporation
License Number: 0491255
License Date: 2018-10-01
License Status: Amended
Spud Date: 2019-09-03
Final Drill Date: 2019-10-06
Well Total Depth: 4586.00 m
Surface Hole Latitude: 54.241430
Surface Hole Longitude: -117.414692

For data sources see[1][2]

Well History

Date Event
2018-10-01 Obtained License
2019-09-03 Set Surface
2019-09-04 Surface Casing Operation Performed
2019-09-05 Direction Drilling Operation Performed - Deviate
2019-09-12 Intermediate Casing Operation Performed
2019-10-02 Resumption
2019-10-03 Direction Drilling Operation Performed - Horizontal
2019-10-03 Well Log Performed
2019-10-06 Finished Drilling
2019-10-06 Production Casing Operation Performed
2019-10-06 Well Log Performed
2019-10-06 Well Mode changed to Drilled and Cased
2019-10-07 Rig Released
2019-11-04 Perforation Treatment Performed - Open-Hole Completion
2019-11-05 Well Log Performed
2019-11-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-11-15 Perforation Treatment Performed - Multi-Stage Fracture
2020-02-23 Well Fluid changed to Gas
2020-02-23 Well Mode changed to Testing
2020-04-01 Well Began Production
2020-04-01 Well Fluid changed to Gas
2020-04-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-10-02 Precision Drilling Corporation 529 Resumption
2019-09-03 Precision Drilling Corporation 529 Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-09-05 1194.30 Deviate (5 - 79 degrees)
2019-10-03 3037.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-11-04 Open Hole/Barefoot Completion 4582.00 4586.00 0
2019-11-15 Multi-Stage Fracture 3914.50 3960.40 0
2019-11-15 Multi-Stage Fracture 3841.80 3887.10 0
2019-11-15 Multi-Stage Fracture 3769.60 3813.00 0
2019-11-15 Multi-Stage Fracture 3694.90 3741.20 0
2019-11-15 Multi-Stage Fracture 3578.30 3666.20 0
2019-11-15 Multi-Stage Fracture 3462.10 3550.80 0
2019-11-15 Multi-Stage Fracture 3347.10 3433.50 0
2019-11-15 Multi-Stage Fracture 3229.80 3318.40 0
2019-11-15 Multi-Stage Fracture 3113.60 3201.40 0
2019-11-14 Multi-Stage Fracture 4509.70 4534.60 0
2019-11-14 Multi-Stage Fracture 4431.90 4477.10 0
2019-11-15 Multi-Stage Fracture 4357.90 4403.40 0
2019-11-15 Multi-Stage Fracture 4283.80 4329.80 0
2019-11-15 Multi-Stage Fracture 4211.00 4256.10 0
2019-11-15 Multi-Stage Fracture 4136.40 4182.20 0
2019-11-15 Multi-Stage Fracture 4063.10 4107.80 0
2019-11-15 Multi-Stage Fracture 3989.00 4034.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-11-14 2019-11-15 2,758 16,120 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 2.7751 N/A
water Not Available 100 86.1295 N/A
Sand - Tier 2 40/70 Trican silica crystalline 14808-60-7 100 10.3013 N/A
Sand - Tier 2 50/140 Trican silica crystalline 14808-60-7 100 2.6159 N/A
Aqucar GA25 Biocide Trican Bactericide/Biocide glutaraldehyde 111-30-8 100 0.0091 N/A
methanol 67-56-1 100 0.0091 N/A
non-hazardous ingredients Not Available 100 0.0091 N/A
Bulk FR-24 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0465 N/A
non-hazardous ingredients Not Available 100 0.0465 N/A
SI-18 Scale Inhibitor Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0151 N/A
BULK-NMR-1N Trican Surfactant methanol 67-56-1 100 0.0661 N/A
non-hazardous ingredients Not Available 100 0.0661 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-08-09 2018-09-10 Surface Water - River 16160

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 186 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-07 No Incident Encountered 0.00 0.00
2019-11-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References

BESbswy