X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605233313003

Well Details

Well ID: 0605233313003
Loading map...
Location: 00/13-33-060-23W5/3
Location Alias: 00/13-33-60-23 W5M
Location Alias 2: 00/13-33-060-23 W5/03
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 23
Section: 33
County/Municipality: Municipal District of Greenview No. 16
Well Name: CCRL PLACID 13-33-60-23
Operator Name: Athabasca Oil Corporation
License Number: 0432002
License Date: 2011-03-02
License Status: Suspension
Spud Date: 2011-08-06
Final Drill Date: 2011-09-21
Well Total Depth: 4017.00 m
Surface Hole Latitude: 54.226103
Surface Hole Longitude: -117.397088

For data sources see[1][2]

Well History

Date Event
2011-03-02 Obtained License
2011-09-06 Direction Drilling Operation Performed - Sidetrack Fish
2011-09-13 Intermediate Casing Operation Performed
2011-09-17 Direction Drilling Operation Performed - Horizontal
2011-09-21 Finished Drilling
2011-09-21 Well Log Performed
2011-09-21 Well Mode changed to Drilled and Cased
2011-09-23 Liner Casing Operation Performed
2011-09-23 Well Log Performed
2011-09-26 Rig Released
2011-10-18 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-19 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-20 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-01 Well Began Production
2011-11-01 Well Fluid changed to Crude Oil
2011-11-01 Well Mode changed to Flowing
2013-08-01 Well Fluid changed to Crude Oil
2013-08-01 Well Mode changed to Suspended
2014-02-01 Well Fluid changed to Crude Oil
2014-02-01 Well Mode changed to Flowing
2016-06-03 Well Fluid changed to Crude Oil
2016-06-03 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-06 2690.00 Sidetrack fish
2011-09-17 2817.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-18 Multi-Stage Fracture 3957.90 3958.00 0
2011-10-20 Multi-Stage Fracture 3251.40 3251.50 0
2011-10-20 Multi-Stage Fracture 3180.30 3180.40 0
2011-10-20 Multi-Stage Fracture 3096.10 3096.20 0
2011-10-20 Multi-Stage Fracture 3011.00 3011.10 0
2011-10-20 Multi-Stage Fracture 2938.70 2938.80 0
2011-10-20 Multi-Stage Fracture 2853.30 2853.40 0
2011-10-19 Multi-Stage Fracture 3884.90 3885.00 0
2011-10-19 Multi-Stage Fracture 3813.50 3813.60 0
2011-10-19 Multi-Stage Fracture 3731.10 3731.20 0
2011-10-19 Multi-Stage Fracture 3660.40 3660.50 0
2011-10-19 Multi-Stage Fracture 3577.00 3577.10 0
2011-10-19 Multi-Stage Fracture 3491.40 3491.50 0
2011-10-19 Multi-Stage Fracture 3421.30 3421.40 0
2011-10-19 Multi-Stage Fracture 3335.80 3335.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 702 0.0 0.0 0.0
2012 3099 0.0 0.0 0.0
2014 4660 0.0 0.0 0.0
2015 5707 0.0 0.0 0.0
2016 1376 0.0 0.0 0.0

For data sources see[6]

References