X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0606010309000

Well Details

Well ID: 0606010309000
Loading map...
Location: 00/09-03-060-01W6/0
Location Alias: 00/09-03-60-01 W6M
Location Alias 2: 00/09-03-060-01 W6/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 6
Range: 01
Section: 03
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER ET AL HZ RESTHA 9-3-60-1
Operator Name: Jupiter Resources Inc.
License Number: 0485125
License Date: 2017-08-23
License Status: Issued
Spud Date: 2017-12-11
Final Drill Date: 2018-01-04
Well Total Depth: 6236.00 m
Surface Hole Latitude: 54.156507
Surface Hole Longitude: -118.098566

For data sources see[1][2]

Well History

Date Event
2017-08-23 Obtained License
2017-12-11 Surface Casing Operation Performed
2017-12-14 Intermediate Casing Operation Performed
2017-12-17 Direction Drilling Operation Performed - Deviate
2017-12-20 Direction Drilling Operation Performed - Horizontal
2018-01-04 Finished Drilling
2018-01-04 Well Log Performed
2018-01-04 Well Mode changed to Drilled and Cased
2018-01-07 Liner Casing Operation Performed
2018-01-11 Rig Released
2018-03-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-13 Well Fluid changed to Gas
2018-07-13 Well Mode changed to Testing
2018-07-17 Well Began Production
2018-07-17 Well Fluid changed to Gas
2018-07-17 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-12-09 Horizon Drilling Inc. 38 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-12-17 2795.00 Deviate (5 - 79 degrees)
2017-12-20 3200.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-03 Multi-Stage Fracture 6148.70 6148.80 0
2018-03-04 Multi-Stage Fracture 5375.60 5375.70 0
2018-03-04 Multi-Stage Fracture 5289.60 5289.70 0
2018-03-05 Multi-Stage Fracture 5204.90 5205.00 0
2018-03-05 Multi-Stage Fracture 5119.60 5119.70 0
2018-03-05 Multi-Stage Fracture 5035.30 5035.40 0
2018-03-05 Multi-Stage Fracture 4950.50 4950.60 0
2018-03-05 Multi-Stage Fracture 4864.90 4865.00 0
2018-03-05 Multi-Stage Fracture 4780.50 4780.60 0
2018-03-05 Multi-Stage Fracture 4696.90 4697.00 0
2018-03-05 Multi-Stage Fracture 4611.30 4611.40 0
2018-03-03 Multi-Stage Fracture 6059.40 6059.50 0
2018-03-05 Multi-Stage Fracture 4527.50 4527.60 0
2018-03-05 Multi-Stage Fracture 4442.50 4442.60 0
2018-03-05 Multi-Stage Fracture 4356.90 4357.00 0
2018-03-05 Multi-Stage Fracture 4271.30 4271.40 0
2018-03-06 Multi-Stage Fracture 4184.60 4184.70 0
2018-03-06 Multi-Stage Fracture 4098.40 4098.50 0
2018-03-06 Multi-Stage Fracture 4011.60 4011.70 0
2018-03-06 Multi-Stage Fracture 3925.50 3925.60 0
2018-03-06 Multi-Stage Fracture 3839.10 3839.20 0
2018-03-06 Multi-Stage Fracture 3724.50 3724.60 0
2018-03-03 Multi-Stage Fracture 5972.40 5972.50 0
2018-03-06 Multi-Stage Fracture 3610.30 3610.40 0
2018-03-06 Multi-Stage Fracture 3495.80 3495.90 0
2018-03-06 Multi-Stage Fracture 3382.20 3382.30 0
2018-03-06 Multi-Stage Fracture 3295.70 3295.80 0
2018-03-04 Multi-Stage Fracture 5887.70 5887.80 0
2018-03-04 Multi-Stage Fracture 5802.50 5802.60 0
2018-03-04 Multi-Stage Fracture 5716.40 5716.50 0
2018-03-04 Multi-Stage Fracture 5630.60 5630.70 0
2018-03-04 Multi-Stage Fracture 5533.70 5533.80 0
2018-03-04 Multi-Stage Fracture 5461.10 5461.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-03 2018-03-06 3,066 24,284 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 87.7375 N/A
30/50 Prime Plus Calfrac Quartz 14808-60-7 100 2.1102 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 9.1519 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.8838 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0113 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0113 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0113 N/A
Polyethylene glycol 25322-68-3 100 0.0113 N/A
Sodium bromide 7647-15-6 100 0.0113 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.077 N/A
DWP-641 Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0919 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0919 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0919 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-03-03 2018-03-06 Central Water Distribution Facility 21262
2018-03-03 2018-03-03 Central Water Distribution Facility 5050

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 4034 0.0 0.0 0.0
2019 8257 0.0 0.0 0.0
2020 2155 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-20 No Incident Encountered 0.00 0.00
2018-04-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References