X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0606010516000

Well Details

Well ID: 0606010516000
Loading map...
Location: 00/16-05-060-01W6/0
Location Alias: 00/16-05-60-01 W6M
Location Alias 2: 00/16-05-060-01 W6/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 6
Range: 01
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER HZ RESTHA 16-5-60-1
Operator Name: Jupiter Resources Inc.
License Number: 0477324
License Date: 2015-10-22
License Status: Amended
Spud Date: 2015-12-16
Final Drill Date: 2016-02-16
Well Total Depth: 5573.00 m
Surface Hole Latitude: 54.170863
Surface Hole Longitude: -118.137357

For data sources see[1][2]

Well History

Date Event
2015-10-22 Obtained License
2015-12-16 Surface Casing Operation Performed
2015-12-25 Direction Drilling Operation Performed - Deviate
2015-12-28 Intermediate Casing Operation Performed
2016-01-29 Direction Drilling Operation Performed - Horizontal
2016-02-16 Finished Drilling
2016-02-16 Well Log Performed
2016-02-16 Well Mode changed to Drilled and Cased
2016-02-20 Production Casing Operation Performed
2016-02-21 Rig Released
2016-08-21 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-22 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-23 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-24 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-28 Well Log Performed
2016-09-06 Well Fluid changed to Gas
2016-09-06 Well Mode changed to Testing
2016-11-02 Well Began Production
2016-11-02 Well Fluid changed to Gas
2016-11-02 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-12-16 Akita Drilling Ltd. 22 N/A Set Surface
2016-01-24 Akita Drilling Ltd. 22 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-12-25 482.90 Deviate (5 - 79 degrees)
2016-01-29 3266.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-08-21 Multi-Stage Fracture 5545.30 5545.40 0
2016-08-22 Multi-Stage Fracture 4752.50 4752.60 0
2016-08-23 Multi-Stage Fracture 4655.40 4655.50 0
2016-08-23 Multi-Stage Fracture 4560.50 4560.60 0
2016-08-23 Multi-Stage Fracture 4463.40 4463.50 0
2016-08-23 Multi-Stage Fracture 4366.40 4366.50 0
2016-08-23 Multi-Stage Fracture 4269.30 4269.40 0
2016-08-23 Multi-Stage Fracture 4172.20 4172.30 0
2016-08-23 Multi-Stage Fracture 4075.30 4075.40 0
2016-08-23 Multi-Stage Fracture 3978.20 3978.30 0
2016-08-23 Multi-Stage Fracture 3881.10 3881.20 0
2016-08-22 Multi-Stage Fracture 5456.60 5456.70 0
2016-08-23 Multi-Stage Fracture 3784.00 3784.10 0
2016-08-23 Multi-Stage Fracture 3686.90 3687.00 0
2016-08-23 Multi-Stage Fracture 3589.80 3589.90 0
2016-08-24 Multi-Stage Fracture 3492.60 3492.70 0
2016-08-24 Multi-Stage Fracture 3395.50 3395.60 0
2016-08-24 Multi-Stage Fracture 3298.50 3298.60 0
2016-08-22 Multi-Stage Fracture 5373.10 5373.20 0
2016-08-22 Multi-Stage Fracture 5289.60 5289.70 0
2016-08-22 Multi-Stage Fracture 5206.10 5206.20 0
2016-08-22 Multi-Stage Fracture 5109.00 5109.10 0
2016-08-22 Multi-Stage Fracture 5025.40 5025.50 0
2016-08-22 Multi-Stage Fracture 4933.10 4933.20 0
2016-08-22 Multi-Stage Fracture 4849.60 4849.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-08-21 2016-08-24 3,154 13,962 N/A
2 2016-08-23 2016-08-24 3,154 0 N/A
3 2016-08-21 2016-08-22 3,154 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.3328 N/A
Prime Plus 30/50 Trican hexamethylenetetramine 100-97-0 100 2.5459 N/A
silica crystalline 14808-60-7 100 2.5459 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 10.5355 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 2.3648 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0114 N/A
2-mercaptoethanol 60-24-2 100 0.0114 N/A
dibromoacetonitrile 3252-43-5 100 0.0114 N/A
non-hazardous ingredients Not Available 100 0.0114 N/A
sodium bromide 7647-15-6 100 0.0114 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1306 N/A
water Not Available 100 0.1306 N/A
GFR-3D Trican Friction Reducer non-hazardous ingredients Not Available 100 0.0322 N/A
sodium chloride 7647-14-5 100 0.0322 N/A
SI-14 Trican Scale Inhibitor methanol 67-56-1 100 0.039 N/A
non-hazardous ingredients Not Available 100 0.039 N/A
2 DF-1 Trican Defoamer non-hazardous ingredients Not Available 100 0.0042 N/A
3 DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.0119 N/A
propylene glycol 57-55-6 100 0.0119 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-08-20 2016-08-23 Central Water Distribution Facility 14002

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 1444 0.0 0.0 0.0
2017 6931 0.0 0.0 0.0
2018 7785 0.0 0.0 0.0
2019 7818 0.0 0.0 0.0
2020 2019 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-01-29 No Incident Encountered 0.00 0.00
2016-10-05 No Incident Encountered 0.00 0.00

For data sources see[10]

References