If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0606010606020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.156142,"lon":-118.099231,"icon":""}]} |
| Location: 02/06-06-060-01W6/0 | |
| Location Alias: 02/06-06-60-01 W6M | |
| Location Alias 2: 02/06-06-060-01 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 060 | |
| Meridian: 6 | |
| Range: 01 | |
| Section: 06 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: JUPITER HZ RESTHA 6-6-60-1 | |
| Operator Name: Jupiter Resources Inc. | |
| License Number: 0475126 | |
| License Date: 2015-04-02 | |
| License Status: Issued | |
| Spud Date: 2015-08-21 | |
| Final Drill Date: 2015-10-04 | |
| Well Total Depth: 5567.00 m | |
| Surface Hole Latitude: 54.156142 | |
| Surface Hole Longitude: -118.099231 |
| Date | Event |
|---|---|
| 2015-04-02 | Obtained License |
| 2015-08-21 | Lost Circulation Occurred |
| 2015-08-24 | Surface Casing Operation Performed |
| 2015-09-12 | Intermediate Casing Operation Performed |
| 2015-09-15 | Direction Drilling Operation Performed - Deviate |
| 2015-09-19 | Direction Drilling Operation Performed - Horizontal |
| 2015-10-04 | Finished Drilling |
| 2015-10-04 | Well Log Performed |
| 2015-10-04 | Well Mode changed to Drilled and Cased |
| 2015-10-06 | Production Casing Operation Performed |
| 2015-10-08 | Rig Released |
| 2015-12-18 | Well Log Performed |
| 2016-01-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-01-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-01-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-01-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-05-13 | Well Fluid changed to Gas |
| 2016-05-13 | Well Mode changed to Testing |
| 2016-09-08 | Well Began Production |
| 2016-09-08 | Well Fluid changed to Gas |
| 2016-09-08 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2015-09-13 | Akita Drilling Ltd. | 22 | N/A | Resumption |
| 2015-08-21 | Akita Drilling Ltd. | 22 | N/A | Set Surface |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2015-09-15 | 2798.60 | Deviate (5 - 79 degrees) |
| 2015-09-19 | 3170.10 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2016-01-26 | Multi-Stage Fracture | 5524.00 | 5524.10 | 0 |
| 2016-01-28 | Multi-Stage Fracture | 4648.60 | 4648.70 | 0 |
| 2016-01-28 | Multi-Stage Fracture | 4547.90 | 4548.00 | 0 |
| 2016-01-28 | Multi-Stage Fracture | 4447.40 | 4447.50 | 0 |
| 2016-01-28 | Multi-Stage Fracture | 4362.50 | 4362.60 | 0 |
| 2016-01-28 | Multi-Stage Fracture | 4276.80 | 4276.90 | 0 |
| 2016-01-28 | Multi-Stage Fracture | 4190.80 | 4190.90 | 0 |
| 2016-01-28 | Multi-Stage Fracture | 4105.00 | 4105.10 | 0 |
| 2016-01-28 | Multi-Stage Fracture | 4019.20 | 4019.30 | 0 |
| 2016-01-28 | Multi-Stage Fracture | 3933.40 | 3933.50 | 0 |
| 2016-01-29 | Multi-Stage Fracture | 3848.60 | 3848.70 | 0 |
| 2016-01-27 | Multi-Stage Fracture | 5432.40 | 5432.50 | 0 |
| 2016-01-29 | Multi-Stage Fracture | 3762.70 | 3762.80 | 0 |
| 2016-01-29 | Multi-Stage Fracture | 3677.00 | 3677.10 | 0 |
| 2016-01-29 | Multi-Stage Fracture | 3593.80 | 3593.90 | 0 |
| 2016-01-29 | Multi-Stage Fracture | 3516.20 | 3516.30 | 0 |
| 2016-01-29 | Multi-Stage Fracture | 3438.50 | 3438.60 | 0 |
| 2016-01-29 | Multi-Stage Fracture | 3357.50 | 3357.60 | 0 |
| 2016-01-29 | Multi-Stage Fracture | 3293.00 | 3293.10 | 0 |
| 2016-01-27 | Multi-Stage Fracture | 5341.10 | 5341.20 | 0 |
| 2016-01-27 | Multi-Stage Fracture | 5239.80 | 5239.90 | 0 |
| 2016-01-27 | Multi-Stage Fracture | 5143.40 | 5143.50 | 0 |
| 2016-01-27 | Multi-Stage Fracture | 5046.70 | 5046.80 | 0 |
| 2016-01-27 | Multi-Stage Fracture | 4946.50 | 4946.60 | 0 |
| 2016-01-27 | Multi-Stage Fracture | 4845.50 | 4845.60 | 0 |
| 2016-01-27 | Multi-Stage Fracture | 4745.40 | 4745.50 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2016-01-26 | 2016-01-29 | 3,089 | 13,973 | N/A |
| 2 | 2016-01-26 | 2016-01-28 | 3,089 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 84.002 | N/A | |||
| Prime Plus 30/50 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 2.8332 | N/A | ||
| silica crystalline | 14808-60-7 | 100 | 2.8332 | N/A | ||||
| Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 10.6183 | N/A | ||
| Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 2.3513 | N/A | ||
| Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0121 | N/A | |
| dibromoacetonitrile | 3252-43-5 | 100 | 0.0121 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0121 | N/A | ||||
| polyethylene glycol | 25322-68-3 | 100 | 0.0121 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.0121 | N/A | ||||
| CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.1396 | N/A | |
| water | Not Available | 100 | 0.1396 | N/A | ||||
| DF-2W | Trican | Defoamer | non-hazardous ingredients | Not Available | 100 | 0.01 | N/A | |
| propylene glycol | 57-55-6 | 100 | 0.01 | N/A | ||||
| GFR-3D | Trican | Friction Reducer | non-hazardous ingredients | Not Available | 100 | 0.0315 | N/A | |
| sodium chloride | 7647-14-5 | 100 | 0.0315 | N/A | ||||
| 2 | SI-14 | Trican | Scale Inhibitor | methanol | 67-56-1 | 100 | 0.0023 | N/A |
| non-hazardous ingredients | Not Available | 100 | 0.0023 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2016-01-25 | 2016-01-29 | Central Water Distribution Facility | 13831 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2016 | 2682 | 0.0 | 0.0 | 0.0 |
| 2017 | 6937 | 0.0 | 0.0 | 0.0 |
| 2018 | 6635 | 0.0 | 0.0 | 0.0 |
| 2019 | 8323 | 0.0 | 0.0 | 0.0 |
| 2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-08-21 | Lost Circulation | 62.00 | 620.00 |
| 2016-02-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]