If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0606030105000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.164543,"lon":-118.332626,"icon":""}]} |
| Location: 00/05-01-060-03W6/0 | |
| Location Alias: 00/05-01-60-03 W6M | |
| Location Alias 2: 00/05-01-060-03 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 060 | |
| Meridian: 6 | |
| Range: 03 | |
| Section: 01 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: ECA RESTHA 5-1-60-3 | |
| Operator Name: Jupiter Resources Inc. | |
| License Number: 0424088 | |
| License Date: 2010-09-30 | |
| License Status: Suspension | |
| Spud Date: 2010-10-17 | |
| Final Drill Date: 2010-12-25 | |
| Well Total Depth: 3720.00 m | |
| Surface Hole Latitude: 54.164543 | |
| Surface Hole Longitude: -118.332626 |
| Date | Event |
|---|---|
| 2010-09-30 | Obtained License |
| 2010-10-18 | Direction Drilling Operation Performed - Deviate |
| 2010-10-21 | Surface Casing Operation Performed |
| 2010-12-16 | Intermediate Casing Operation Performed |
| 2010-12-25 | Finished Drilling |
| 2010-12-25 | Well Mode changed to Drilled and Cased |
| 2010-12-27 | Well Log Performed |
| 2010-12-28 | Production Casing Operation Performed |
| 2010-12-28 | Rig Released |
| 2011-02-16 | Well Log Performed |
| 2011-02-17 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-18 | Perforation Treatment Performed - Fractured |
| 2011-02-18 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-18 | Well Log Performed |
| 2011-02-19 | Perforation Treatment Performed - Fractured |
| 2011-02-20 | Perforation Treatment Performed - Fractured |
| 2011-02-20 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-21 | Well Log Performed |
| 2011-02-22 | Perforation Treatment Performed - Fractured |
| 2011-02-22 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-23 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-23 | Well Log Performed |
| 2011-02-24 | Perforation Treatment Performed - Fractured |
| 2011-02-25 | Well Fluid changed to Gas |
| 2011-02-25 | Well Mode changed to Testing |
| 2011-03-11 | Well Fluid changed to Gas |
| 2011-03-11 | Well Mode changed to Test Completed |
| 2012-01-31 | Well Began Production |
| 2012-01-31 | Well Fluid changed to Gas |
| 2012-01-31 | Well Mode changed to Flowing |
| 2013-03-06 | Well Fluid changed to Gas |
| 2013-03-06 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-10-18 | 140.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-02-17 | Perforation | 3685.00 | 3687.00 | 6 |
| 2011-02-22 | Perforation | 3265.00 | 3269.00 | 10 |
| 2011-02-22 | Fracture | 3265.00 | 3269.00 | 0 |
| 2011-02-23 | Perforation | 3088.00 | 3089.00 | 6 |
| 2011-02-23 | Perforation | 3084.00 | 3086.00 | 6 |
| 2011-02-23 | Perforation | 3078.00 | 3079.00 | 6 |
| 2011-02-24 | Fracture | 3078.00 | 3089.00 | 0 |
| 2011-02-17 | Perforation | 3677.00 | 3679.00 | 6 |
| 2011-02-18 | Perforation | 3610.00 | 3612.00 | 6 |
| 2011-02-18 | Perforation | 3607.00 | 3608.00 | 6 |
| 2011-02-18 | Perforation | 3589.00 | 3590.00 | 6 |
| 2011-02-18 | Fracture | 3677.00 | 3687.00 | 0 |
| 2011-02-19 | Fracture | 3589.00 | 3612.00 | 0 |
| 2011-02-20 | Perforation | 3413.00 | 3417.00 | 10 |
| 2011-02-20 | Fracture | 3413.00 | 3417.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 1 | 0.0 | 0.0 | 0.0 |
| 2012 | 38 | 0.0 | 0.0 | 0.0 |
For data sources see[6]