X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0606053107002

Well Details

Well ID: 0606053107002
Loading map...
Location: 00/07-31-060-05W6/2
Location Alias: 00/07-31-60-05 W6M
Location Alias 2: 00/07-31-060-05 W6/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 6
Range: 05
Section: 31
County/Municipality: Municipal District of Greenview No. 16
Well Name: CINCH ET AL CHIME 7-31-60-5
Operator Name: Tourmaline Oil Corp.
License Number: 0079995
License Date: 1979-12-20
License Status: Amended
Spud Date: 1980-01-07
Final Drill Date: 1980-07-10
Well Total Depth: 5391.00 m
Surface Hole Latitude: 54.229561
Surface Hole Longitude: -118.732698

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-12-20 Obtained License
1980-01-08 Lost Circulation Occurred
1980-01-10 Lost Circulation Occurred
1980-01-11 Lost Circulation Occurred
1980-02-09 Lost Circulation Occurred
1980-07-10 Finished Drilling
1980-07-31 Well Log Performed
1980-08-05 Plug Back Performed
1980-08-11 Plug Back Performed
1980-08-15 Production Casing Operation Performed
1980-08-26 Rig Released
1981-09-05 Well Log Performed
1982-03-06 Perforation Treatment Performed - Jet Perforation
1982-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-31 Perforation Treatment Performed - Jet Perforation
1987-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-06-27 Well Log Performed
1987-06-30 Perforation Treatment Performed - Jet Perforation
1987-07-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-01 Perforation Treatment Performed - Jet Perforation
1987-07-01 Well Log Performed
1987-07-03 Perforation Treatment Performed - Fractured
1987-07-05 Well Log Performed
1987-07-07 Well Log Performed
1987-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-08 Perforation Treatment Performed - Cement Squeeze
1987-07-08 Perforation Treatment Performed - Jet Perforation
1987-07-08 Well Log Performed
1987-07-09 Perforation Treatment Performed - Jet Perforation
1987-07-10 Perforation Treatment Performed - Cement Squeeze
1987-07-10 Perforation Treatment Performed - Jet Perforation
1987-07-10 Well Log Performed
1987-07-12 Perforation Treatment Performed - Jet Perforation
1987-07-13 Perforation Treatment Performed - Fractured
1987-07-13 Well Log Performed
1987-07-16 Well Log Performed
1987-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-07-27 Well Mode changed to Drilled and Cased
2002-10-02 Perforation Treatment Performed - Jet Perforation
2002-10-03 Lost Circulation Occurred
2002-10-04 Kick Occurred
2002-10-04 Perforation Treatment Performed - Jet Perforation
2002-10-11 Perforation Treatment Performed - Jet Perforation
2002-10-13 Drill Stem Test Performed
2002-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-13 Plug Back Performed
2002-10-13 Well Mode changed to Abandoned and Whipstocked
2003-12-06 Liner Casing Operation Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-03-06 Perforation 3201.00 3204.00 13
1987-07-08 Perforation 1964.00 1966.00 13
1987-07-08 Acid Treatment 1964.00 1966.00 0
1987-07-08 Cement Squeeze 1964.00 1966.00 0
1987-07-09 Perforation 1914.00 1916.00 13
1987-07-10 Perforation 1891.00 1893.50 13
1987-07-10 Cement Squeeze 1891.00 1916.00 0
1987-07-12 Perforation 1936.00 1942.00 13
1987-07-12 Perforation 1930.00 1936.00 13
1987-07-13 Fracture 1930.00 1942.00 0
1987-07-25 Packing Device Capped w/Cement 1776.00 1884.00 0
1982-03-26 Packing Device Capped w/Cement 2985.00 2985.00 0
2002-10-02 Perforation 1930.00 1942.00 13
2002-10-04 Perforation 2871.00 2875.00 13
2002-10-11 Perforation 2849.50 2857.50 20
2002-10-13 Packing Device Capped w/Cement 2834.00 2842.00 0
1982-03-31 Perforation 2871.00 2875.00 13
1982-03-31 Acid Treatment 2871.00 2875.00 0
1987-06-27 Packing Device Capped w/Cement 1972.00 1976.00 0
1987-06-30 Perforation 1936.00 1942.00 13
1987-07-01 Perforation 1930.00 1936.00 13
1987-07-01 Acid Treatment 1930.00 1942.00 0
1987-07-03 Fracture 1930.00 1942.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-01-08 Lost Circulation 58.00 58.00
1980-01-10 Lost Circulation 177.00 177.00
1980-01-11 Lost Circulation 244.00 244.00
1980-02-09 Lost Circulation 1679.00 1699.00
2002-10-03 Lost Circulation 1958.40 1958.40
2002-10-04 Kick 2861.00 2861.00

For data sources see[5]

References