X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0606063210002

Well Details

Well ID: 0606063210002
Loading map...
Location: 00/10-32-060-06W6/2
Location Alias: 00/10-32-60-06 W6M
Location Alias 2: 00/10-32-060-06 W6/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 6
Range: 06
Section: 32
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA CUTPICK 10-32-60-6
Operator Name: Jupiter Resources Inc.
License Number: 0435631
License Date: 2011-07-29
License Status: Issued
Spud Date: 2011-10-30
Final Drill Date: 2011-11-29
Well Total Depth: 3700.00 m
Surface Hole Latitude: 54.240053
Surface Hole Longitude: -118.871318

For data sources see[1][2]

Well History

Date Event
2011-05-17 Well Log Performed
2011-07-29 Obtained License
2011-11-17 Direction Drilling Operation Performed - Deviate
2011-11-17 Well Log Performed
2011-11-24 Intermediate Casing Operation Performed
2011-11-24 Well Log Performed
2011-11-29 Finished Drilling
2011-11-30 Well Log Performed
2011-11-30 Well Mode changed to Drilled and Cased
2011-12-02 Liner Casing Operation Performed
2011-12-02 Perforation Treatment Performed - Open-Hole Completion
2011-12-04 Rig Released
2011-12-16 Well Log Performed
2011-12-30 Perforation Treatment Performed - Jet Perforation
2011-12-30 Well Log Performed
2011-12-31 Perforation Treatment Performed - Fractured
2011-12-31 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-02 Perforation Treatment Performed - Jet Perforation
2012-01-02 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-02 Well Log Performed
2012-01-03 Perforation Treatment Performed - Fractured
2012-01-29 Well Fluid changed to Gas
2012-01-29 Well Mode changed to Testing
2012-02-18 Well Began Production
2012-02-18 Well Fluid changed to Gas
2012-02-18 Well Mode changed to Flowing
2014-10-01 Well Fluid changed to Gas
2014-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-17 2002.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-02 Open Hole/Barefoot Completion 3690.05 3700.00 0
2012-01-02 Multi-Stage Fracture 3227.60 3228.90 0
2012-01-02 Multi-Stage Fracture 3007.00 3008.30 0
2012-01-02 Perforation 2405.00 2407.00 20
2012-01-03 Fracture 2405.00 2407.00 0
2011-12-30 Perforation 3655.00 3657.00 14
2011-12-31 Fracture 3655.00 3657.00 0
2011-12-31 Multi-Stage Fracture 3605.70 3607.00 0
2011-12-31 Multi-Stage Fracture 3572.10 3573.40 0
2012-01-01 Multi-Stage Fracture 3467.60 3468.90 0
2012-01-01 Multi-Stage Fracture 3430.90 3432.10 0
2012-01-01 Multi-Stage Fracture 3370.70 3371.90 0
2012-01-01 Multi-Stage Fracture 3323.40 3324.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7534 0.0 0.0 0.0
2013 7380 0.0 0.0 0.0
2014 8747 0.0 0.0 0.0
2015 8579 0.0 0.0 0.0
2016 4710 0.0 0.0 0.0
2017 8454 0.0 0.0 0.0
2018 2712 0.0 0.0 0.0
2019 7656 0.0 0.0 0.0
2020 2161 0.0 0.0 0.0

For data sources see[6]

References