X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614022210002

Well Details

Well ID: 0614022210002
Loading map...
Location: 00/10-22-061-02W4/2
Location Alias: 00/10-22-61-02 W4M
Location Alias 2: 00/10-22-061-02 W4/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 02
Section: 22
County/Municipality: Cold Lake 149
Well Name: KASTEN KENT 10-22-61-2
Operator Name: Kasten Energy Inc.
License Number: 0269612
License Date: 2002-04-26
License Status: Suspension
Spud Date: 2002-05-16
Final Drill Date: 2002-05-18
Well Total Depth: 538.00 m
Surface Hole Latitude: 54.288798
Surface Hole Longitude: -110.213429

For data sources see[1][2]

Well History

Date Event
2002-04-26 Obtained License
2002-05-16 Direction Drilling Operation Performed - Deviate
2002-05-16 Surface Casing Operation Performed
2002-05-17 Well Log Performed
2002-05-18 Finished Drilling
2002-05-18 Production Casing Operation Performed
2002-05-18 Rig Released
2002-05-18 Well Mode changed to Drilled and Cased
2002-06-11 Well Log Performed
2002-06-12 Perforation Treatment Performed - Jet Perforation
2002-06-12 Well Log Performed
2002-07-17 Well Log Performed
2009-08-30 Perforation Treatment Performed - Cement Plug
2009-08-30 Plug Back Performed
2009-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-31 Perforation Treatment Performed - Jet Perforation
2009-08-31 Plug Back Performed
2009-08-31 Well Log Performed
2009-09-01 Well Began Production
2009-09-01 Well Fluid changed to Crude Bitumen
2009-09-01 Well Mode changed to Pumping
2015-08-31 Well Fluid changed to Crude Bitumen
2015-08-31 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-05-16 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-06-12 Perforation 442.00 444.00 26
2002-06-12 Perforation 445.00 446.00 26
2009-08-30 Cement Plug 450.00 523.00 0
2009-08-31 Packing Device Capped w/Cement 431.00 439.00 0
2009-08-31 Perforation 403.00 408.00 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 484 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0

For data sources see[6]

References