If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0614080207000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.242637,"lon":-111.088679,"icon":""}]} |
Location: 00/07-02-061-08W4/0 | |
Location Alias: 00/07-02-61-08 W4M | |
Location Alias 2: 00/07-02-061-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 4 | |
Range: 08 | |
Section: 02 | |
County/Municipality: Municipal District of Bonnyville No. 87 | |
Well Name: Vantage SUGDEN 7-2-61-8 | |
Operator Name: Vantage Point Resources Inc. | |
License Number: 0057565 | |
License Date: 1976-03-16 | |
License Status: Issued | |
Spud Date: 1976-03-19 | |
Final Drill Date: 1976-03-23 | |
Well Total Depth: 509.00 m | |
Surface Hole Latitude: 54.242637 | |
Surface Hole Longitude: -111.088679 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-03-16 | Obtained License |
1976-03-23 | Finished Drilling |
1976-03-24 | Drill Stem Test Performed |
1976-03-24 | Production Casing Operation Performed |
1976-03-24 | Well Mode changed to Drilled and Cased |
1976-09-24 | Perforation Treatment Performed - Jet Perforation |
1982-06-21 | Well Began Production |
1982-06-21 | Well Fluid changed to Gas |
1982-06-21 | Well Mode changed to Flowing |
1984-09-16 | Well Log Performed |
1984-09-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-09-17 | Perforation Treatment Performed - Jet Perforation |
1984-09-17 | Plug Back Performed |
1984-09-17 | Well Fluid changed to Gas |
1984-09-17 | Well Mode changed to Abandoned Zone |
1984-11-17 | Well Log Performed |
1984-11-18 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-09-24 | Perforation | 343.20 | 344.40 | 0 |
1976-09-24 | Perforation | 345.00 | 346.20 | 0 |
1976-09-24 | Perforation | 347.40 | 348.60 | 0 |
1984-09-17 | Packing Device Capped w/Cement | 332.00 | 340.00 | 0 |
1984-09-17 | Perforation | 305.50 | 307.00 | 7 |
1984-09-17 | Perforation | 308.00 | 310.00 | 7 |
1984-11-18 | Perforation | 305.50 | 307.00 | 7 |
1984-11-18 | Perforation | 308.00 | 310.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 126 | 0.0 | 0.0 | 0.0 |
1983 | 838 | 0.0 | 0.0 | 0.0 |
For data sources see[5]