X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614081611020

Well Details

Well ID: 0614081611020
Loading map...
Location: 02/11-16-061-08W4/0
Location Alias: 02/11-16-61-08 W4M
Location Alias 2: 02/11-16-061-08 W4/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 08
Section: 16
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: Vantage SUGDEN 11-16-61-8
Operator Name: Vantage Point Resources Inc.
License Number: 0199921
License Date: 1997-03-27
License Status: Issued
Spud Date: 1997-03-30
Final Drill Date: 1997-03-31
Well Total Depth: 409.00 m
Surface Hole Latitude: 54.278319
Surface Hole Longitude: -111.146070

For data sources see[1][2]

Well History

Date Event
1997-03-27 Obtained License
1997-03-30 Surface Casing Operation Performed
1997-03-31 Finished Drilling
1997-03-31 Production Casing Operation Performed
1997-03-31 Rig Released
1997-03-31 Well Log Performed
1997-03-31 Well Mode changed to Drilled and Cased
1997-05-26 Perforation Treatment Performed - Jet Perforation
1997-05-28 Well Began Production
1997-05-28 Well Fluid changed to Crude Bitumen
1997-05-28 Well Mode changed to Pumping
1998-01-05 Well Fluid changed to Crude Bitumen
1998-01-05 Well Mode changed to Suspended
1999-10-01 Well Fluid changed to Crude Bitumen
1999-10-01 Well Mode changed to Pumping
2000-09-01 Well Fluid changed to Crude Bitumen
2000-09-01 Well Mode changed to Suspended
2001-09-01 Well Fluid changed to Crude Bitumen
2001-09-01 Well Mode changed to Pumping
2002-01-07 Well Fluid changed to Crude Bitumen
2002-01-07 Well Mode changed to Suspended
2003-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-03 Plug Back Performed
2003-03-03 Well Fluid changed to Crude Bitumen
2003-03-03 Well Mode changed to Abandoned Zone
2003-03-04 Perforation Treatment Performed - Jet Perforation
2003-03-04 Well Log Performed
2003-03-05 Perforation Treatment Performed - Jet Perforation
2003-03-05 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-05-26 Perforation 379.00 382.50 26
2003-03-03 Packing Device Capped w/Cement 367.40 375.40 0
2003-03-04 Perforation 348.00 349.00 13
2003-03-05 Perforation 297.80 298.40 13
2003-03-05 Perforation 299.30 300.00 13
2003-03-05 Perforation 301.50 302.00 13
2003-03-05 Perforation 302.50 303.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 4272 0.0 0.0 0.0
1999 186 0.0 0.0 0.0
2001 120 0.0 0.0 0.0
2002 991 0.0 0.0 0.0

For data sources see[5]

References