If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0615113116002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.324722,"lon":-115.629176,"icon":""}]} |
| Location: 00/16-31-061-11W5/2 | |
| Location Alias: 00/16-31-61-11 W5M | |
| Location Alias 2: 00/16-31-061-11 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 061 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 31 | |
| County/Municipality: Woodlands County | |
| Well Name: ACCEL HOLDINGS CARSONN 16-31-61-11 | |
| Operator Name: ACCEL Canada Holdings Limited | |
| License Number: 0020434 | |
| License Date: 1961-02-17 | |
| License Status: Abandoned | |
| Spud Date: 1961-02-24 | |
| Final Drill Date: 1961-03-31 | |
| Well Total Depth: 2663.60 m | |
| Surface Hole Latitude: 54.324722 | |
| Surface Hole Longitude: -115.629176 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1961-02-17 | Obtained License |
| 1961-03-05 | Drill Stem Test Performed |
| 1961-03-31 | Finished Drilling |
| 1961-03-31 | Well Mode changed to Drilled and Cased |
| 1961-04-01 | Drill Stem Test Performed |
| 1961-04-02 | Production Casing Operation Performed |
| 1961-04-28 | Perforation Treatment Performed - Jet Perforation |
| 1961-05-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-01-19 | Perforation Treatment Performed - Jet Perforation |
| 1980-01-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1990-08-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1990-08-18 | Plug Back Performed |
| 1990-08-19 | Well Log Performed |
| 1990-08-20 | Perforation Treatment Performed - Jet Perforation |
| 1990-08-20 | Well Log Performed |
| 1990-08-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1990-08-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1990-09-01 | Perforation Treatment Performed - Jet Perforation |
| 1990-09-01 | Well Log Performed |
| 1990-09-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1990-09-11 | Perforation Treatment Performed - Jet Perforation |
| 1990-09-11 | Well Log Performed |
| 1990-09-12 | Perforation Treatment Performed - Cement Squeeze |
| 1990-09-12 | Well Log Performed |
| 1990-09-13 | Perforation Treatment Performed - Cement Squeeze |
| 1990-09-13 | Plug Back Performed |
| 1990-09-14 | Perforation Treatment Performed - Cement Squeeze |
| 1990-09-14 | Well Log Performed |
| 1990-09-18 | Perforation Treatment Performed - Jet Perforation |
| 1990-09-18 | Well Log Performed |
| 1990-09-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1990-09-19 | Plug Back Performed |
| 1990-09-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1990-09-20 | Plug Back Performed |
| 1990-09-20 | Well Log Performed |
| 1990-09-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1990-11-01 | Well Began Production |
| 1990-11-01 | Well Fluid changed to Gas |
| 1990-11-01 | Well Mode changed to Flowing |
| 1992-08-05 | Perforation Treatment Performed - Cement Plug |
| 1992-08-06 | Well Fluid changed to Gas |
| 1992-08-06 | Well Mode changed to Suspended |
| 1992-08-07 | Perforation Treatment Performed - Jet Perforation |
| 1992-08-09 | Perforation Treatment Performed - Jet Perforation |
| 1992-08-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2003-03-06 | Well Log Performed |
| 2003-03-07 | Perforation Treatment Performed - Jet Perforation |
| 2004-11-04 | Well Log Performed |
| 2004-11-05 | Perforation Treatment Performed - Jet Perforation |
| 2004-11-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-11-06 | Perforation Treatment Performed - Jet Perforation |
| 2004-11-06 | Plug Back Performed |
| 2004-11-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-11-08 | Perforation Treatment Performed - Jet Perforation |
| 2004-11-08 | Plug Back Performed |
| 2004-11-09 | Perforation Treatment Performed - Remedial Casing |
| 2004-11-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-11-10 | Plug Back Performed |
| 2004-11-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-11-11 | Perforation Treatment Performed - Jet Perforation |
| 2004-11-11 | Plug Back Performed |
| 2004-11-12 | Perforation Treatment Performed - Remedial Casing |
| 2004-11-13 | Perforation Treatment Performed - Cement Plug |
| 2004-11-13 | Perforation Treatment Performed - Jet Perforation |
| 2004-11-13 | Plug Back Performed |
| 2004-11-13 | Well Fluid changed to Gas |
| 2004-11-13 | Well Mode changed to Abandoned Zone |
| 2004-11-14 | Perforation Treatment Performed - Remedial Casing |
| 2004-11-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-11-23 | Perforation Treatment Performed - Jet Perforation |
| 2004-11-23 | Plug Back Performed |
| 2004-11-23 | Well Log Performed |
| 2004-11-24 | Perforation Treatment Performed - Remedial Casing |
| 2004-11-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-11-25 | Perforation Treatment Performed - Jet Perforation |
| 2004-11-25 | Plug Back Performed |
| 2004-11-25 | Well Log Performed |
| 2004-11-26 | Perforation Treatment Performed - Remedial Casing |
| 2004-11-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-11-27 | Perforation Treatment Performed - Jet Perforation |
| 2004-11-27 | Plug Back Performed |
| 2004-11-27 | Well Log Performed |
| 2004-11-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-11-28 | Perforation Treatment Performed - Jet Perforation |
| 2004-11-28 | Perforation Treatment Performed - Remedial Casing |
| 2004-11-28 | Plug Back Performed |
| 2004-11-29 | Perforation Treatment Performed - Jet Perforation |
| 2004-11-29 | Well Log Performed |
| 2004-11-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-11-30 | Perforation Treatment Performed - Remedial Casing |
| 2004-11-30 | Plug Back Performed |
| 2004-12-01 | Perforation Treatment Performed - Jet Perforation |
| 2004-12-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-12-02 | Perforation Treatment Performed - Remedial Casing |
| 2004-12-02 | Plug Back Performed |
| 2005-12-01 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1961-04-28 | Perforation | 2617.60 | 2625.50 | 7 |
| 1990-08-28 | Acid Treatment | 1612.40 | 1614.20 | 0 |
| 1990-08-30 | Acid Treatment | 1612.40 | 1614.20 | 0 |
| 1990-09-01 | Perforation | 1388.00 | 1391.00 | 13 |
| 1990-09-01 | Perforation | 1350.40 | 1351.40 | 13 |
| 1990-09-01 | Perforation | 1353.00 | 1354.50 | 13 |
| 1990-09-01 | Perforation | 1355.70 | 1358.00 | 13 |
| 1990-09-01 | Perforation | 1359.00 | 1359.50 | 13 |
| 1990-09-09 | Acid Treatment | 1388.00 | 1391.00 | 0 |
| 1990-09-11 | Perforation | 1662.00 | 1662.50 | 13 |
| 1990-09-12 | Cement Squeeze | 1662.00 | 1662.50 | 0 |
| 1961-04-28 | Perforation | 2627.40 | 2629.80 | 7 |
| 1990-09-13 | Cement Squeeze | 1612.40 | 1614.20 | 0 |
| 1990-09-14 | Cement Squeeze | 1388.00 | 1391.00 | 0 |
| 1990-09-18 | Perforation | 1652.00 | 1655.00 | 13 |
| 1990-09-19 | Packing Device Capped w/Cement | 1548.40 | 1650.00 | 0 |
| 1990-09-20 | Packing Device Capped w/Cement | 1377.00 | 1385.00 | 0 |
| 1990-09-21 | Acid Treatment | 1350.40 | 1359.50 | 0 |
| 1992-08-05 | Cement Plug | 1350.40 | 1359.50 | 0 |
| 1992-08-07 | Perforation | 1388.00 | 1391.00 | 13 |
| 1992-08-09 | Perforation | 1652.00 | 1655.00 | 13 |
| 1992-08-11 | Acid Treatment | 1652.00 | 1655.00 | 0 |
| 1961-04-28 | Perforation | 2634.10 | 2638.30 | 7 |
| 2003-03-07 | Perforation | 1651.10 | 1654.50 | 13 |
| 2004-11-05 | Perforation | 2103.70 | 2105.70 | 17 |
| 2004-11-06 | Packing Device Capped w/Cement | 2088.50 | 2096.50 | 0 |
| 2004-11-06 | Perforation | 1926.50 | 1928.50 | 17 |
| 2004-11-08 | Packing Device Capped w/Cement | 1911.00 | 1919.00 | 0 |
| 2004-11-08 | Perforation | 1692.00 | 1694.00 | 17 |
| 2004-11-09 | Remedial Casing Cementing | 1692.00 | 1694.00 | 0 |
| 2004-11-10 | Packing Device Capped w/Cement | 1625.80 | 1679.50 | 0 |
| 2004-11-11 | Packing Device Capped w/Cement | 1596.50 | 1604.50 | 0 |
| 2004-11-11 | Perforation | 1573.50 | 1575.50 | 17 |
| 1961-05-19 | Acid Treatment | 2617.60 | 2638.30 | 0 |
| 2004-11-12 | Remedial Casing Cementing | 1573.50 | 1575.50 | 0 |
| 2004-11-13 | Cement Plug | 1307.80 | 1565.00 | 0 |
| 2004-11-13 | Perforation | 604.00 | 606.00 | 17 |
| 2004-11-14 | Remedial Casing Cementing | 604.00 | 606.00 | 0 |
| 2004-11-23 | Perforation | 561.00 | 563.00 | 17 |
| 2004-11-23 | Packing Device Capped w/Cement | 588.00 | 596.00 | 0 |
| 2004-11-24 | Remedial Casing Cementing | 561.00 | 563.00 | 0 |
| 2004-11-25 | Packing Device Capped w/Cement | 549.50 | 557.50 | 0 |
| 2004-11-25 | Perforation | 545.00 | 547.00 | 17 |
| 2004-11-26 | Remedial Casing Cementing | 545.00 | 547.00 | 0 |
| 1980-01-19 | Perforation | 2601.00 | 2607.50 | 13 |
| 2004-11-27 | Packing Device Capped w/Cement | 529.00 | 539.00 | 0 |
| 2004-11-27 | Perforation | 505.00 | 507.00 | 17 |
| 2004-11-28 | Packing Device Capped w/Cement | 492.30 | 500.30 | 0 |
| 2004-11-28 | Perforation | 436.00 | 438.00 | 17 |
| 2004-11-28 | Remedial Casing Cementing | 436.00 | 438.00 | 0 |
| 2004-11-28 | Packing Device Capped w/Cement | 419.00 | 429.00 | 0 |
| 2004-11-29 | Perforation | 362.00 | 364.00 | 17 |
| 2004-11-30 | Remedial Casing Cementing | 362.00 | 364.00 | 0 |
| 2004-11-30 | Packing Device Capped w/Cement | 337.50 | 352.80 | 0 |
| 2004-12-01 | Perforation | 296.00 | 298.00 | 17 |
| 1980-01-20 | Acid Treatment | 2601.00 | 2607.50 | 0 |
| 2004-12-02 | Remedial Casing Cementing | 296.00 | 298.00 | 0 |
| 2004-12-02 | Packing Device Capped w/Cement | 270.50 | 289.50 | 0 |
| 1990-08-18 | Packing Device Capped w/Cement | 2595.00 | 2595.00 | 0 |
| 1990-08-20 | Perforation | 1652.00 | 1655.10 | 13 |
| 1990-08-20 | Perforation | 1612.40 | 1614.20 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1990 | 657 | 0.0 | 0.0 | 0.0 |
| 1991 | 6707 | 0.0 | 0.0 | 0.0 |
| 1992 | 4761 | 0.0 | 0.0 | 0.0 |
For data sources see[5]