If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0615123406000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.317753,"lon":-115.717031,"icon":""}]} |
| Location: 00/06-34-061-12W5/0 | |
| Location Alias: 00/06-34-61-12 W5M | |
| Location Alias 2: 00/06-34-061-12 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 061 | |
| Meridian: 5 | |
| Range: 12 | |
| Section: 34 | |
| County/Municipality: Woodlands County | |
| Well Name: ACCEL HOLDINGS CARSONN 6-34-61-12 | |
| Operator Name: ACCEL Canada Holdings Limited | |
| License Number: 0021663 | |
| License Date: 1961-11-09 | |
| License Status: Issued | |
| Spud Date: 1962-02-24 | |
| Final Drill Date: 1962-03-26 | |
| Well Total Depth: 2670.00 m | |
| Surface Hole Latitude: 54.317753 | |
| Surface Hole Longitude: -115.717031 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1961-11-09 | Obtained License |
| 1962-03-26 | Finished Drilling |
| 1962-03-26 | Well Mode changed to Drilled and Cased |
| 1962-03-28 | Production Casing Operation Performed |
| 1962-03-31 | Perforation Treatment Performed - Jet Perforation |
| 1962-04-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1962-04-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1962-04-11 | Well Began Production |
| 1962-04-11 | Well Fluid changed to Crude Oil |
| 1962-04-11 | Well Mode changed to Flowing |
| 1964-02-02 | Perforation Treatment Performed - Selective Jet Perforations |
| 1964-02-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1964-02-08 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1964-02-16 | Well Began Injection |
| 1964-02-16 | Well Fluid changed to Water |
| 1964-02-16 | Well Type changed to Injection |
| 1964-04-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1964-07-12 | Perforation Treatment Performed - Jet Perforation |
| 1964-07-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1965-08-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1965-08-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1966-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1969-05-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1969-05-26 | Perforation Treatment Performed - Cement Squeeze |
| 1969-05-26 | Well Fluid changed to Water |
| 1969-05-26 | Well Type changed to Injection |
| 1970-09-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1971-10-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1974-01-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-12-16 | Well Log Performed |
| 1986-01-17 | Well Log Performed |
| 1986-01-19 | Well Log Performed |
| 1986-01-23 | Perforation Treatment Performed - Jet Perforation |
| 1986-01-23 | Well Log Performed |
| 1987-03-02 | Well Log Performed |
| 1987-03-05 | Perforation Treatment Performed - Fractured |
| 1989-08-26 | Well Log Performed |
| 1991-12-12 | Well Log Performed |
| 1992-02-17 | Well Log Performed |
| 1992-02-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-02-21 | Well Log Performed |
| 1999-03-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2000-05-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2016-08-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2016-09-01 | Well Log Performed |
| 2018-12-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1962-03-31 | Perforation | 2578.90 | 2580.40 | 7 |
| 1964-02-02 | Selective Jet Perforations | 2606.30 | 2608.50 | 0 |
| 1964-02-02 | Selective Jet Perforations | 2608.80 | 2612.10 | 0 |
| 1964-02-02 | Selective Jet Perforations | 2612.70 | 2613.40 | 0 |
| 1964-02-02 | Selective Jet Perforations | 2614.60 | 2616.40 | 0 |
| 1964-02-02 | Selective Jet Perforations | 2621.60 | 2621.90 | 0 |
| 1964-02-02 | Selective Jet Perforations | 2625.20 | 2625.90 | 0 |
| 1964-02-02 | Selective Jet Perforations | 2626.80 | 2627.10 | 0 |
| 1964-02-02 | Selective Jet Perforations | 2629.20 | 2629.50 | 0 |
| 1964-02-08 | Acid Wash | 2578.90 | 2585.00 | 0 |
| 1964-02-08 | Acid Treatment | 2596.30 | 2629.50 | 0 |
| 1962-03-31 | Perforation | 2581.00 | 2582.90 | 7 |
| 1964-04-09 | Acid Treatment | 2578.90 | 2585.00 | 0 |
| 1964-07-12 | Perforation | 2578.90 | 2583.50 | 3 |
| 1964-07-12 | Perforation | 2593.50 | 2596.30 | 13 |
| 1964-07-12 | Perforation | 2599.90 | 2601.20 | 3 |
| 1964-07-12 | Perforation | 2602.10 | 2605.70 | 3 |
| 1964-07-12 | Perforation | 2609.40 | 2616.10 | 3 |
| 1964-07-12 | Perforation | 2617.90 | 2623.10 | 3 |
| 1964-07-22 | Acid Treatment | 2578.90 | 2585.00 | 0 |
| 1965-08-08 | Acid Treatment | 2593.50 | 2623.10 | 0 |
| 1965-08-15 | Acid Treatment | 2593.50 | 2623.10 | 0 |
| 1962-03-31 | Perforation | 2600.20 | 2603.90 | 7 |
| 1966-03-07 | Acid Treatment | 2599.90 | 2623.10 | 0 |
| 1969-05-25 | Acid Treatment | 2593.50 | 2623.10 | 0 |
| 1969-05-25 | Acid Treatment | 2578.90 | 2583.50 | 0 |
| 1969-05-26 | Cement Squeeze | 2578.90 | 2583.50 | 0 |
| 1970-09-02 | Acid Treatment | 2593.50 | 2623.10 | 0 |
| 1971-10-08 | Acid Treatment | 2593.50 | 2623.10 | 0 |
| 1974-01-17 | Acid Treatment | 2593.50 | 2623.10 | 0 |
| 1986-01-23 | Perforation | 2610.60 | 2615.20 | 13 |
| 1986-01-23 | Perforation | 2616.10 | 2617.00 | 13 |
| 1986-01-23 | Perforation | 2605.50 | 2606.40 | 13 |
| 1962-04-05 | Acid Treatment | 2600.20 | 2603.90 | 0 |
| 1986-01-23 | Perforation | 2608.50 | 2609.40 | 13 |
| 1986-01-23 | Perforation | 2621.30 | 2621.90 | 13 |
| 1987-03-05 | Fracture | 2593.50 | 2629.50 | 0 |
| 1992-02-19 | Acid Treatment | 2593.50 | 2629.50 | 0 |
| 1999-03-11 | Acid Treatment | 2596.30 | 2628.00 | 0 |
| 2000-05-05 | Acid Treatment | 2593.50 | 2628.00 | 0 |
| 2016-08-27 | Acid Treatment | 2593.50 | 2623.10 | 0 |
| 2018-12-04 | Acid Treatment | 2600.20 | 2603.90 | 0 |
| 2018-12-04 | Acid Treatment | 2593.50 | 2628.00 | 0 |
| 1962-04-06 | Acid Treatment | 2578.90 | 2582.90 | 0 |
| 1964-02-02 | Selective Jet Perforations | 2584.40 | 2584.70 | 0 |
| 1964-02-02 | Selective Jet Perforations | 2585.00 | 2596.30 | 0 |
| 1964-02-02 | Selective Jet Perforations | 2596.90 | 2597.50 | 0 |
| 1964-02-02 | Selective Jet Perforations | 2604.50 | 2605.70 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 0 | 0.0 | 0.0 | 0.0 |
| 1968 | 0 | 0.0 | 0.0 | 0.0 |
| 1969 | 0 | 0.0 | 0.0 | 0.0 |
| 1970 | 0 | 0.0 | 0.0 | 0.0 |
| 1971 | 0 | 0.0 | 0.0 | 0.0 |
| 1972 | 0 | 0.0 | 0.0 | 0.0 |
| 1973 | 0 | 0.0 | 0.0 | 0.0 |
| 1974 | 0 | 0.0 | 0.0 | 0.0 |
| 1975 | 0 | 0.0 | 0.0 | 0.0 |
| 1976 | 0 | 0.0 | 0.0 | 0.0 |
| 1977 | 0 | 0.0 | 0.0 | 0.0 |
| 1978 | 0 | 0.0 | 0.0 | 0.0 |
| 1979 | 0 | 0.0 | 0.0 | 0.0 |
| 1980 | 0 | 0.0 | 0.0 | 0.0 |
| 1981 | 0 | 0.0 | 0.0 | 0.0 |
| 1982 | 0 | 0.0 | 0.0 | 0.0 |
| 1983 | 0 | 0.0 | 0.0 | 0.0 |
| 1984 | 0 | 0.0 | 0.0 | 0.0 |
| 1985 | 0 | 0.0 | 0.0 | 0.0 |
| 1986 | 0 | 0.0 | 0.0 | 0.0 |
| 1987 | 0 | 0.0 | 0.0 | 0.0 |
| 1988 | 0 | 0.0 | 0.0 | 0.0 |
| 1989 | 0 | 0.0 | 0.0 | 0.0 |
| 1990 | 0 | 0.0 | 0.0 | 0.0 |
| 1991 | 0 | 0.0 | 0.0 | 0.0 |
| 1992 | 0 | 0.0 | 0.0 | 0.0 |
| 1993 | 0 | 0.0 | 0.0 | 0.0 |
| 1994 | 0 | 0.0 | 0.0 | 0.0 |
| 1995 | 0 | 0.0 | 0.0 | 0.0 |
| 1996 | 0 | 0.0 | 0.0 | 0.0 |
| 1997 | 0 | 0.0 | 0.0 | 0.0 |
| 1998 | 0 | 0.0 | 0.0 | 0.0 |
| 1999 | 0 | 0.0 | 0.0 | 0.0 |
| 2000 | 0 | 0.0 | 0.0 | 0.0 |
| 2001 | 0 | 0.0 | 0.0 | 0.0 |
| 2002 | 0 | 0.0 | 0.0 | 0.0 |
| 2003 | 0 | 0.0 | 0.0 | 0.0 |
| 2004 | 0 | 0.0 | 0.0 | 0.0 |
| 2005 | 0 | 0.0 | 0.0 | 0.0 |
| 2006 | 0 | 0.0 | 0.0 | 0.0 |
| 2007 | 0 | 0.0 | 0.0 | 0.0 |
| 2008 | 0 | 0.0 | 0.0 | 0.0 |
| 2009 | 0 | 0.0 | 0.0 | 0.0 |
| 2010 | 0 | 0.0 | 0.0 | 0.0 |
| 2011 | 0 | 0.0 | 0.0 | 0.0 |
| 2012 | 0 | 0.0 | 0.0 | 0.0 |
| 2013 | 0 | 0.0 | 0.0 | 0.0 |
| 2014 | 0 | 0.0 | 0.0 | 0.0 |
| 2015 | 0 | 0.0 | 0.0 | 0.0 |
| 2016 | 0 | 0.0 | 0.0 | 0.0 |
| 2017 | 0 | 0.0 | 0.0 | 0.0 |
| 2018 | 0 | 0.0 | 0.0 | 0.0 |
| 2019 | 0 | 0.0 | 0.0 | 0.0 |
| 2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-08-27 | No Incident Encountered | 0.00 | 0.00 |
| 2016-09-10 | No Incident Encountered | 0.00 | 0.00 |
| 2018-12-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]