X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615172212000

Well Details

Well ID: 0615172212000
Loading map...
Location: 00/12-22-061-17W5/0
Location Alias: 00/12-22-61-17 W5M
Location Alias 2: 00/12-22-061-17 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 17
Section: 22
County/Municipality: Alexander 134A
Well Name: PELOTON FOXCK 12-22-61-17
Operator Name: Cequence Energy Ltd.
License Number: 0409348
License Date: 2009-02-20
License Status: Abandoned
Spud Date: 2009-03-05
Final Drill Date: 2009-03-27
Well Total Depth: 3063.00 m
Surface Hole Latitude: 54.291573
Surface Hole Longitude: -116.453040

For data sources see[1][2]

Well History

Date Event
2009-02-20 Obtained License
2009-03-09 Surface Casing Operation Performed
2009-03-14 Well Log Performed
2009-03-16 Direction Drilling Operation Performed - Deviate
2009-03-21 Direction Drilling Operation Performed - Horizontal
2009-03-21 Well Log Performed
2009-03-22 Intermediate Casing Operation Performed
2009-03-27 Finished Drilling
2009-03-27 Well Log Performed
2009-03-27 Well Mode changed to Drilled and Cased
2009-03-28 Liner Casing Operation Performed
2009-03-28 Perforation Treatment Performed - Slotted Liner or Casing
2009-03-29 Rig Released
2009-04-03 Liner Casing Operation Performed
2009-04-03 Perforation Treatment Performed - Fractured
2009-04-03 Perforation Treatment Performed - Slotted Liner or Casing
2010-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-05 Plug Back Performed
2010-03-05 Well Mode changed to Abandoned Zone
2010-03-06 Well Abandoned
2010-03-06 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-03-16 1832.67 Deviate (5 - 79 degrees)
2009-03-21 2145.11 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-03-28 Slotted Liner 2162.00 3054.60 0
2009-04-03 Fracture 2258.50 2350.20 0
2009-04-03 Fracture 2162.00 2258.50 0
2009-04-03 Slotted Liner 2162.00 3054.60 0
2010-03-05 Packing Device Capped w/Cement 1974.00 1985.00 0
2009-04-03 Fracture 2976.90 3054.60 0
2009-04-03 Fracture 2897.00 2976.90 0
2009-04-03 Fracture 2805.80 2897.00 0
2009-04-03 Fracture 2714.50 2805.80 0
2009-04-03 Fracture 2623.20 2714.50 0
2009-04-03 Fracture 2532.10 2623.20 0
2009-04-03 Fracture 2441.70 2532.10 0
2009-04-03 Fracture 2350.20 2441.70 0

For data sources see[5]



References