If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0615180704000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.27092,"lon":-116.704047,"icon":""}]} |
Location: 00/04-07-061-18W5/0 | |
Location Alias: 00/04-07-61-18 W5M | |
Location Alias 2: 00/04-07-061-18 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 5 | |
Range: 18 | |
Section: 07 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TANGLE CREEK KAYBOBS 4-7-61-18 | |
Operator Name: Tangle Creek Energy Ltd. | |
License Number: 0446637 | |
License Date: 2012-06-19 | |
License Status: Issued | |
Spud Date: 2012-07-14 | |
Final Drill Date: 2012-08-18 | |
Well Total Depth: 3350.00 m | |
Surface Hole Latitude: 54.270920 | |
Surface Hole Longitude: -116.704047 |
Date | Event |
---|---|
2012-06-19 | Obtained License |
2012-07-16 | Surface Casing Operation Performed |
2012-08-10 | Direction Drilling Operation Performed - Deviate |
2012-08-12 | Direction Drilling Operation Performed - Horizontal |
2012-08-18 | Finished Drilling |
2012-08-18 | Well Log Performed |
2012-08-18 | Well Mode changed to Drilled and Cased |
2012-08-19 | Liner Casing Operation Performed |
2012-08-19 | Production Casing Operation Performed |
2012-08-21 | Rig Released |
2012-08-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-24 | Perforation Treatment Performed - Open-Hole Completion |
2012-08-26 | Well Log Performed |
2012-09-18 | Well Began Production |
2012-09-18 | Well Fluid changed to Crude Oil |
2012-09-18 | Well Mode changed to Flowing |
2012-09-30 | Well Fluid changed to Crude Oil |
2012-09-30 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-07-14 | Ensign Drilling Inc. | 116 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-10 | 1330.60 | Deviate (5 - 79 degrees) |
2012-08-12 | 1934.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-24 | Open Hole/Barefoot Completion | 3347.00 | 3350.00 | 0 |
2012-08-24 | Multi-Stage Fracture | 2814.00 | 2814.10 | 0 |
2012-08-24 | Multi-Stage Fracture | 2754.40 | 2754.50 | 0 |
2012-08-24 | Multi-Stage Fracture | 2695.40 | 2695.50 | 0 |
2012-08-24 | Multi-Stage Fracture | 2636.60 | 2636.70 | 0 |
2012-08-24 | Multi-Stage Fracture | 2577.10 | 2577.20 | 0 |
2012-08-24 | Multi-Stage Fracture | 2519.90 | 2520.00 | 0 |
2012-08-24 | Multi-Stage Fracture | 2460.10 | 2460.20 | 0 |
2012-08-24 | Multi-Stage Fracture | 2403.30 | 2403.40 | 0 |
2012-08-24 | Multi-Stage Fracture | 2345.30 | 2345.40 | 0 |
2012-08-24 | Multi-Stage Fracture | 2289.20 | 2289.30 | 0 |
2012-08-24 | Multi-Stage Fracture | 3335.30 | 3335.40 | 0 |
2012-08-24 | Multi-Stage Fracture | 2230.60 | 2230.70 | 0 |
2012-08-24 | Multi-Stage Fracture | 2170.70 | 2170.80 | 0 |
2012-08-24 | Multi-Stage Fracture | 2114.00 | 2114.10 | 0 |
2012-08-24 | Multi-Stage Fracture | 2057.40 | 2057.50 | 0 |
2012-08-24 | Multi-Stage Fracture | 3286.60 | 3286.70 | 0 |
2012-08-24 | Multi-Stage Fracture | 3227.90 | 3228.00 | 0 |
2012-08-24 | Multi-Stage Fracture | 3169.80 | 3169.90 | 0 |
2012-08-24 | Multi-Stage Fracture | 3050.50 | 3050.60 | 0 |
2012-08-24 | Multi-Stage Fracture | 2991.40 | 2991.50 | 0 |
2012-08-24 | Multi-Stage Fracture | 2930.90 | 2931.00 | 0 |
2012-08-24 | Multi-Stage Fracture | 2872.90 | 2873.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1889 | 0.0 | 0.0 | 0.0 |
2013 | 8591 | 0.0 | 0.0 | 0.0 |
2014 | 6547 | 0.0 | 0.0 | 0.0 |
2015 | 8377 | 0.0 | 0.0 | 0.0 |
2016 | 7784 | 0.0 | 0.0 | 0.0 |
2017 | 7584 | 0.0 | 0.0 | 0.0 |
2018 | 6615 | 0.0 | 0.0 | 0.0 |
2019 | 6692 | 0.0 | 0.0 | 0.0 |
2020 | 1679 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-22 | No Incident Encountered | 0.00 | 0.00 |
2012-09-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]