X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615181613000

Well Details

Well ID: 0615181613000
Loading map...
Location: 00/13-16-061-18W5/0
Location Alias: 00/13-16-61-18 W5M
Location Alias 2: 00/13-16-061-18 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 18
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: TANGLE CREEK FOXCK 13-16-61-18
Operator Name: Tangle Creek Energy Ltd.
License Number: 0448176
License Date: 2012-08-31
License Status: Issued
Spud Date: 2012-09-20
Final Drill Date: 2012-09-29
Well Total Depth: 2957.00 m
Surface Hole Latitude: 54.266994
Surface Hole Longitude: -116.650306

For data sources see[1][2]

Well History

Date Event
2012-08-31 Obtained License
2012-09-22 Surface Casing Operation Performed
2012-09-24 Direction Drilling Operation Performed - Deviate
2012-09-26 Direction Drilling Operation Performed - Horizontal
2012-09-29 Finished Drilling
2012-09-29 Well Mode changed to Drilled and Cased
2012-10-01 Production Casing Operation Performed
2012-10-01 Rig Released
2012-10-28 Well Log Performed
2012-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-31 Perforation Treatment Performed - Open-Hole Completion
2012-11-23 Well Began Production
2012-11-23 Well Fluid changed to Crude Oil
2012-11-23 Well Mode changed to Flowing
2012-12-23 Well Fluid changed to Crude Oil
2012-12-23 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-09-20 Trinidad Drilling Ltd. 68 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-09-24 1338.80 Deviate (5 - 79 degrees)
2012-09-26 1805.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-31 Open Hole/Barefoot Completion 2755.00 2957.00 0
2012-10-31 Multi-Stage Fracture 2121.50 2121.60 0
2012-10-31 Multi-Stage Fracture 2048.50 2048.60 0
2012-10-31 Multi-Stage Fracture 1975.20 1975.30 0
2012-10-31 Multi-Stage Fracture 1913.60 1913.70 0
2012-10-31 Multi-Stage Fracture 2711.50 2711.60 0
2012-10-31 Multi-Stage Fracture 2635.40 2635.50 0
2012-10-31 Multi-Stage Fracture 2550.60 2550.70 0
2012-10-31 Multi-Stage Fracture 2477.00 2477.10 0
2012-10-31 Multi-Stage Fracture 2415.30 2415.40 0
2012-10-31 Multi-Stage Fracture 2318.90 2319.00 0
2012-10-31 Multi-Stage Fracture 2257.00 2257.10 0
2012-10-31 Multi-Stage Fracture 2194.70 2194.80 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 953 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8335 0.0 0.0 0.0
2015 8567 0.0 0.0 0.0
2016 8483 0.0 0.0 0.0
2017 8083 0.0 0.0 0.0
2018 7844 0.0 0.0 0.0
2019 4470 0.0 0.0 0.0
2020 1771 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-20 No Incident Encountered 0.00 0.00
2012-10-25 No Incident Encountered 0.00 0.00

For data sources see[8]

References