If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0615190413000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.252528,"lon":-116.774283,"icon":""}]} |
Location: 00/13-04-061-19W5/0 | |
Location Alias: 00/13-04-61-19 W5M | |
Location Alias 2: 00/13-04-061-19 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 5 | |
Range: 19 | |
Section: 04 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TANGLE CREEK KAYBOBS 13-4-61-19 | |
Operator Name: Tangle Creek Energy Ltd. | |
License Number: 0454658 | |
License Date: 2013-02-06 | |
License Status: Amended | |
Spud Date: 2013-02-12 | |
Final Drill Date: 2013-02-21 | |
Well Total Depth: 3252.00 m | |
Surface Hole Latitude: 54.252528 | |
Surface Hole Longitude: -116.774283 |
Date | Event |
---|---|
2013-02-06 | Obtained License |
2013-02-14 | Surface Casing Operation Performed |
2013-02-15 | Direction Drilling Operation Performed - Deviate |
2013-02-17 | Direction Drilling Operation Performed - Horizontal |
2013-02-21 | Finished Drilling |
2013-02-21 | Well Mode changed to Drilled and Cased |
2013-02-23 | Production Casing Operation Performed |
2013-02-24 | Rig Released |
2013-03-07 | Well Log Performed |
2013-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-03-13 | Perforation Treatment Performed - Open-Hole Completion |
2013-04-17 | Well Began Production |
2013-04-17 | Well Fluid changed to Crude Oil |
2013-04-17 | Well Mode changed to Flowing |
2013-05-17 | Well Fluid changed to Crude Oil |
2013-05-17 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-02-12 | Trinidad Drilling Ltd. | 22 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-02-15 | 1482.00 | Deviate (5 - 79 degrees) |
2013-02-17 | 1862.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-03-13 | Open Hole/Barefoot Completion | 3195.00 | 3252.00 | 0 |
2013-03-13 | Multi-Stage Fracture | 2574.50 | 2574.60 | 0 |
2013-03-13 | Multi-Stage Fracture | 2501.20 | 2501.30 | 0 |
2013-03-13 | Multi-Stage Fracture | 2428.70 | 2428.80 | 0 |
2013-03-13 | Multi-Stage Fracture | 2355.40 | 2355.50 | 0 |
2013-03-13 | Multi-Stage Fracture | 2282.40 | 2282.50 | 0 |
2013-03-13 | Multi-Stage Fracture | 2220.40 | 2220.50 | 0 |
2013-03-13 | Multi-Stage Fracture | 2159.30 | 2159.40 | 0 |
2013-03-13 | Multi-Stage Fracture | 2097.30 | 2097.40 | 0 |
2013-03-13 | Multi-Stage Fracture | 2035.60 | 2035.70 | 0 |
2013-03-13 | Multi-Stage Fracture | 1974.60 | 1974.70 | 0 |
2013-03-13 | Multi-Stage Fracture | 3159.40 | 3159.50 | 0 |
2013-03-13 | Multi-Stage Fracture | 3083.90 | 3084.00 | 0 |
2013-03-13 | Multi-Stage Fracture | 3010.90 | 3011.00 | 0 |
2013-03-13 | Multi-Stage Fracture | 2938.10 | 2938.20 | 0 |
2013-03-13 | Multi-Stage Fracture | 2865.70 | 2865.80 | 0 |
2013-03-13 | Multi-Stage Fracture | 2793.40 | 2793.50 | 0 |
2013-03-13 | Multi-Stage Fracture | 2720.90 | 2721.00 | 0 |
2013-03-13 | Multi-Stage Fracture | 2647.50 | 2647.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-03-13 | 2013-03-13 | 1,740 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water (Including Mix Water Supplied by Client)* | Not Available | 100 | 42.1018 | N/A | |||
ClearFRAC XT; N002 | Schlumberger | Crystalline silica | 14808-60-7 | 100 | 26.6474 | N/A | ||
ClearFRAC XT; N002 | Schlumberger | Energizing Fluid | 2-butoxyethanol | 111-76-2 | 100 | 0.006 | N/A | |
Acetic acid ethenyl ester; polymer with ethenol | 25213-24-5 | 100 | 0.0016 | N/A | ||||
Benzenesulfonic acid; 4-ethenyl-; sodium salt; homopolymer | 25704-18-1 | 100 | 0.0179 | N/A | ||||
Butan-1-ol | 71-36-3 | 100 | 0.0024 | N/A | ||||
Cholinium chloride | 67-48-1 | 100 | 0.0768 | N/A | ||||
Erucic amidopropyl dimethyl betaine | 149879-98-1 | 100 | 0.2474 | N/A | ||||
Ethane-1;2-diol | 107-21-1 | 100 | 0 | N/A | ||||
Linear/branched c11 alcohol ethoxylate (3 eo) | 127036-24-2 | 100 | 0.002 | N/A | ||||
Linear/branched c11 alcohol ethoxylate (8 eo) | 127036-24-2 | 100 | 0.0094 | N/A | ||||
Magnesium silicate hydrate (talc) | 14807-96-6 | 100 | 0.0002 | N/A | ||||
Nitrogen; liquid form | 7727-37-9 | 100 | 30.6852 | N/A | ||||
Polyvinyl acetate; partially hydrolyzed | 304443-60-5 | 100 | 0.0006 | N/A | ||||
Propan-2-ol | 67-63-0 | 100 | 0.1847 | N/A | ||||
Sodium chloride | 7647-14-5 | 100 | 0.0339 | N/A | ||||
Sodium chloroacetate | 3926-62-3 | 100 | 0.0032 | N/A | ||||
Undecanol; branched and linear (impurity) | 128973-77-3 | 100 | 0.0006 | N/A | ||||
Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 100 | 0.0075 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-03-23 | 2013-03-24 | Surface Water - Runoff | 680 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 5889 | 0.0 | 0.0 | 0.0 |
2014 | 8502 | 0.0 | 0.0 | 0.0 |
2015 | 7782 | 0.0 | 0.0 | 0.0 |
2016 | 7583 | 0.0 | 0.0 | 0.0 |
2017 | 7972 | 0.0 | 0.0 | 0.0 |
2018 | 6746 | 0.0 | 0.0 | 0.0 |
2019 | 7579 | 0.0 | 0.0 | 0.0 |
2020 | 1272 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-02-24 | No Incident Encountered | 0.00 | 0.00 |
2013-03-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]