X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615200304020

Well Details

Well ID: 0615200304020
Loading map...
Location: 02/04-03-061-20W5/0
Location Alias: 02/04-03-61-20 W5M
Location Alias 2: 02/04-03-061-20 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 20
Section: 03
County/Municipality: Municipal District of Greenview No. 16
Well Name: TANGLE CREEK KAYBOBS 4-3-61-20
Operator Name: Tangle Creek Energy Ltd.
License Number: 0450714
License Date: 2012-11-23
License Status: Issued
Spud Date: 2012-12-02
Final Drill Date: 2012-12-10
Well Total Depth: 3320.00 m
Surface Hole Latitude: 54.241848
Surface Hole Longitude: -116.897884

For data sources see[1][2]

Well History

Date Event
2012-11-23 Obtained License
2012-12-03 Surface Casing Operation Performed
2012-12-05 Direction Drilling Operation Performed - Deviate
2012-12-07 Direction Drilling Operation Performed - Horizontal
2012-12-10 Finished Drilling
2012-12-10 Well Mode changed to Drilled and Cased
2012-12-12 Production Casing Operation Performed
2012-12-13 Rig Released
2012-12-15 Well Log Performed
2012-12-18 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-18 Perforation Treatment Performed - Open-Hole Completion
2013-01-09 Well Log Performed
2013-01-24 Well Began Production
2013-01-24 Well Fluid changed to Crude Oil
2013-01-24 Well Mode changed to Flowing
2013-02-24 Well Fluid changed to Crude Oil
2013-02-24 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-12-02 Trinidad Drilling Ltd. 22 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-12-05 1377.10 Deviate (5 - 79 degrees)
2012-12-07 1899.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-12-18 Open Hole/Barefoot Completion 3318.60 3320.00 0
2012-12-18 Multi-Stage Fracture 2684.60 2684.70 0
2012-12-18 Multi-Stage Fracture 2610.80 2610.90 0
2012-12-18 Multi-Stage Fracture 2537.10 2537.20 0
2012-12-18 Multi-Stage Fracture 2463.40 2463.50 0
2012-12-18 Multi-Stage Fracture 2389.90 2390.00 0
2012-12-18 Multi-Stage Fracture 2316.20 2316.30 0
2012-12-18 Multi-Stage Fracture 2242.30 2242.40 0
2012-12-18 Multi-Stage Fracture 2169.40 2169.50 0
2012-12-18 Multi-Stage Fracture 2095.50 2095.60 0
2012-12-18 Multi-Stage Fracture 2021.60 2021.70 0
2012-12-18 Multi-Stage Fracture 3283.70 3283.80 0
2012-12-18 Multi-Stage Fracture 3207.10 3207.20 0
2012-12-18 Multi-Stage Fracture 3133.20 3133.30 0
2012-12-18 Multi-Stage Fracture 3059.80 3059.90 0
2012-12-18 Multi-Stage Fracture 2987.50 2987.60 0
2012-12-18 Multi-Stage Fracture 2916.30 2916.40 0
2012-12-18 Multi-Stage Fracture 2831.90 2832.00 0
2012-12-18 Multi-Stage Fracture 2758.50 2758.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 6676 0.0 0.0 0.0
2014 8198 0.0 0.0 0.0
2015 8524 0.0 0.0 0.0
2016 8021 0.0 0.0 0.0
2017 8418 0.0 0.0 0.0
2018 7985 0.0 0.0 0.0
2019 7067 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-02 No Incident Encountered 0.00 0.00
2012-12-15 No Incident Encountered 0.00 0.00

For data sources see[8]

References