X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615201810000

Well Details

Well ID: 0615201810000
Loading map...
Location: 00/10-18-061-20W5/0
Location Alias: 00/10-18-61-20 W5M
Location Alias 2: 00/10-18-061-20 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 20
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN ET AL KAYBOBS 10-18-61-20
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0179661
License Date: 1995-08-01
License Status: Issued
Spud Date: 1995-08-16
Final Drill Date: 1995-08-25
Well Total Depth: 2223.00 m
Surface Hole Latitude: 54.278554
Surface Hole Longitude: -116.986387

For data sources see[1][2]

Well History

Date Event
1995-08-01 Obtained License
1995-08-17 Surface Casing Operation Performed
1995-08-25 Finished Drilling
1995-08-25 Well Mode changed to Drilled and Cased
1995-08-27 Well Log Performed
1995-08-28 Production Casing Operation Performed
1995-08-28 Rig Released
1995-09-05 Perforation Treatment Performed - Jet Perforation
1995-09-05 Well Log Performed
1995-09-07 Perforation Treatment Performed - Fractured
1995-09-07 Well Log Performed
1995-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-12 Perforation Treatment Performed - Jet Perforation
1995-09-12 Plug Back Performed
1995-09-12 Well Log Performed
1995-09-14 Perforation Treatment Performed - Fractured
1995-09-15 Well Log Performed
1995-09-21 Perforation Treatment Performed - Jet Perforation
1995-09-21 Well Log Performed
1995-09-23 Perforation Treatment Performed - Fractured
1995-10-14 Well Began Production
1995-10-14 Well Fluid changed to Gas
1995-10-14 Well Mode changed to Flowing
1995-10-16 Well Fluid changed to Gas
1995-10-16 Well Mode changed to Flowing
1997-01-21 Well Fluid changed to Gas
1997-01-21 Well Mode changed to Flowing
2006-04-01 Perforation Treatment Performed - Jet Perforation
2006-04-03 Perforation Treatment Performed - Fractured
2011-06-01 Well Fluid changed to Gas
2011-06-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-09-05 Perforation 2189.00 2191.00 13
2006-04-01 Perforation 1915.00 1919.00 20
2006-04-03 Fracture 1915.00 1919.00 0
1995-09-05 Perforation 2193.00 2195.00 13
1995-09-07 Fracture 2189.00 2195.00 0
1995-09-12 Packing Device Capped w/Cement 2179.80 2187.80 0
1995-09-12 Perforation 2160.00 2168.00 18
1995-09-14 Fracture 2160.00 2168.00 0
1995-09-21 Perforation 1857.50 1859.50 18
1995-09-21 Perforation 1861.50 1864.00 18
1995-09-23 Fracture 1857.50 1864.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 775 0.0 0.0 0.0
1996 4450 0.0 0.0 0.0
1997 8037 0.0 0.0 0.0
1998 7824 0.0 0.0 0.0
1999 8716 0.0 0.0 0.0
2000 8408 0.0 0.0 0.0
2001 8677 0.0 0.0 0.0
2002 8601 0.0 0.0 0.0
2003 8523 0.0 0.0 0.0
2004 8552 0.0 0.0 0.0
2005 8639 0.0 0.0 0.0
2006 7704 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 8663 0.0 0.0 0.0
2011 8637 0.0 0.0 0.0
2012 8619 0.0 0.0 0.0
2013 8687 0.0 0.0 0.0
2014 8441 0.0 0.0 0.0
2015 8758 0.0 0.0 0.0
2016 8492 0.0 0.0 0.0
2017 8423 0.0 0.0 0.0
2018 6832 0.0 0.0 0.0
2019 7018 0.0 0.0 0.0
2020 1848 0.0 0.0 0.0

For data sources see[5]

References