X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615201810002

Well Details

Well ID: 0615201810002
Loading map...
Location: 00/10-18-061-20W5/2
Location Alias: 00/10-18-61-20 W5M
Location Alias 2: 00/10-18-061-20 W5/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 20
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN ET AL KAYBOBS 10-18-61-20
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0179661
License Date: 1995-08-01
License Status: Issued
Spud Date: 1995-08-16
Final Drill Date: 1995-08-25
Well Total Depth: 2223.00 m
Surface Hole Latitude: 54.278554
Surface Hole Longitude: -116.986387

For data sources see[1][2]

Well History

Date Event
1995-08-01 Obtained License
1995-08-17 Surface Casing Operation Performed
1995-08-25 Finished Drilling
1995-08-25 Well Mode changed to Drilled and Cased
1995-08-27 Well Log Performed
1995-08-28 Production Casing Operation Performed
1995-08-28 Rig Released
1995-09-05 Perforation Treatment Performed - Jet Perforation
1995-09-05 Well Log Performed
1995-09-07 Perforation Treatment Performed - Fractured
1995-09-07 Well Log Performed
1995-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-12 Perforation Treatment Performed - Jet Perforation
1995-09-12 Plug Back Performed
1995-09-12 Well Log Performed
1995-09-14 Perforation Treatment Performed - Fractured
1995-09-15 Well Log Performed
1995-09-21 Perforation Treatment Performed - Jet Perforation
1995-09-21 Well Log Performed
1995-09-23 Perforation Treatment Performed - Fractured
1995-10-16 Well Began Production
1995-10-16 Well Fluid changed to Gas
1995-10-16 Well Mode changed to Flowing
1997-01-21 Well Structure changed to Commingled
2006-04-01 Perforation Treatment Performed - Jet Perforation
2006-04-03 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-09-05 Perforation 2189.00 2191.00 13
2006-04-01 Perforation 1915.00 1919.00 20
2006-04-03 Fracture 1915.00 1919.00 0
1995-09-05 Perforation 2193.00 2195.00 13
1995-09-07 Fracture 2189.00 2195.00 0
1995-09-12 Packing Device Capped w/Cement 2179.80 2187.80 0
1995-09-12 Perforation 2160.00 2168.00 18
1995-09-14 Fracture 2160.00 2168.00 0
1995-09-21 Perforation 1857.50 1859.50 18
1995-09-21 Perforation 1861.50 1864.00 18
1995-09-23 Fracture 1857.50 1864.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1355 0.0 0.0 0.0
1996 7110 0.0 0.0 0.0
1997 147 0.0 0.0 0.0

For data sources see[5]

References